← All fights
12 days left
An unpaved national forest road climbing through autumn aspens

Open for comment · closes November 3

Stop 3,921-Acre Swan Valley Logging Before Mitigation Is Written

Pictured: An unpaved national forest road climbing through autumn aspensMore Than Just Parks
What
The agency proposes 3,268 acres of commercial harvest and 4.6 miles of new temporary roads while admitting that the design features meant to protect water, wildlife, and soils have not yet been written.
Where
Flathead National Forest, MT
By when
Comments to U.S. Forest Service by November 3, 2026.Date from Forest Service CARA comment page ↗, read October 22, 2026.

What to ask forAll 10 points →

The agency should either publish the design features before the comment period closes or extend the comment period to allow meaningful public review once those features are finalized.

Where these four lines come from
  • WhatOur plain-English read of the Forest Service project page ↗. Check it against the agency’s own words under Case.
  • WhereThe places and states the project page names, as PLAN read them.
  • 26.9 miles“National Forest System haul routes 26.9” Table 3 Open the document ↗
  • approximately 99% (3,911 acres)“Approximately 99% (3,911 acres) of the proposed treatment units are within areas designated by the Emergency Action Determination.” Analysis Authorities Open the document ↗
  • 730 acres“The project includes approximately 730 acres of commercial treatment and 98 acres of noncommercial treatment within outer riparian management zones.” Treatment in Riparian Management Zones Open the document ↗
  • By whenNovember 3, 2026, from Forest Service CARA comment page, the notice text ↗: “requested through 11/3/2026 11:59:59 PM (Mountain Standard Time)”. Read October 22, 2026.
  • Read from PLAN’s record October 22, 2026.
Now make it count12 days left

Two ways to be heard on this, and both count. Comment for the legal record, then call the members who answer to you.

Comment now

10 holes in the agency’s own analysis

Make these points, in your own words

  • The document states that design features intended to avoid or reduce environmental impacts are still under development and will not be finalized until after scoping comments are reviewed.Read the point +

    This means the public is being asked to comment on a proposed action whose mitigation measures do not yet exist. Without knowing what design features will apply, commenters cannot evaluate whether the proposed 3,921 acres of treatment and 4.6 miles of temporary road construction will cause significant impacts. The agency should either publish the design features before the comment period closes or extend the comment period to allow meaningful public review once those features are finalized.

  • The document invokes emergency authority under Section 40807 of the Infrastructure Investment and Jobs Act for approximately 99% of the proposed treatment units, yet provides no analysis, data, or findings demonstrating that an emergency condition exists that cannot wait for standard NEPA review.Read the point +

    The Secretarial Memorandum 1078-006 is cited but not reproduced or summarized, making it impossible for the public to evaluate whether the emergency designation is legally valid. The agency should disclose the Emergency Action Determination, explain the factual basis for the emergency finding, and explain why standard EA procedures are insufficient here.

  • The document describes 730 acres of commercial treatment and 98 acres of noncommercial treatment within outer riparian management zones, yet provides no site-specific analysis of how ground-based logging equipment, haul routes, or temporary roads will affect stream channels, water quality, or riparian vegetation in these areas.Read the point +

    The purpose and need section cites insect and disease mortality and fuel loading but does not connect these specifically to riparian conditions. The agency should complete and disclose a riparian impact analysis, including effects on water quality and stream orchid and other riparian species already noted in project photos, before finalizing the decision.

  • The project area lies entirely within the Northern Continental Divide Ecosystem grizzly bear primary conservation area and within multiple lynx analysis units, yet the document contains no discussion of effects on either species.Read the point +

    No biological assessment, effects determination, or consultation status under the Endangered Species Act is mentioned. The agency should disclose whether formal or informal Section 7 consultation with the U.S. Fish and Wildlife Service has been initiated, and should not proceed with 3,921 acres of ground-disturbing treatment until ESA consultation is complete and disclosed to the public.

  • The document acknowledges that some seed tree units may create openings larger than 40 acres, yet provides no analysis of how such large openings interact with grizzly bear movement, lynx habitat connectivity, or old-growth recruitment objectives stated in the Forest Plan.Read the point +

    The Forest Plan desired conditions specifically call for promoting the sustainability and connectivity of old-growth forests, but the document makes no attempt to reconcile large regeneration openings with that goal. The agency should analyze the cumulative effect of openings exceeding 40 acres on wildlife habitat connectivity and old-growth conditions before finalizing the action.

Say something only you can say. The law requires the agency to consider and respond to substantive comments, and specifics are what make a comment substantive.

Every point is checked against the agency’s own document ↗. 10 findings verified against the text, word for word.