Record closed October 6, 2026
PLAN's read: critical threat

Stop the plan to strip roadless protection from 44.7 million acres

Special Areas; Roadless Area Conservation

Forest Service· National Forest SystemFederal Register 2026-16965 ↗

The proposed Ambler Road corridor, Gates of the Arctic, Alaska
The proposed Ambler Road corridor, Gates of the Arctic, Alaska · public land, held in trust for you

The groups on this fight

15 groups work this ground: Chugach National Forest, Bitterroot National Forest, Flathead National Forest

Works this ground means the editors' sourced record puts the group on this land, not that it has taken a side on this decision. Give straight to them; nothing routes through us.

  • Los Padres ForestWatch

    Works this ground · not linked to this decision

    Works this ground at Los Padres National Forest: Has led opposition to oil drilling in the Los Padres region for two decades and is fighting the plan to reopen 400,000 acres to leasing.

    Source ↗
  • Southeast Alaska Conservation Council

    Works this ground · not linked to this decision

    Works this ground at Tongass National Forest: Southeast Alaska’s homegrown defender of the Tongass since 1970.

    Source ↗
  • Sierra Club

    Works this ground · not linked to this decision

    Works this ground at Allegheny National Forest: Longtime co-plaintiff in litigation against Forest Service timber projects on the Allegheny, including the East Side clearcutting case; works this ground at Los Padres National Forest: Plaintiff in the litigation that stopped new oil leasing on the Central Coast acreage now targeted again by BLM.

    Source ↗
  • Center for Biological Diversity

    Works this ground · not linked to this decision

    Works this ground at Allegheny National Forest: Fighting the current logging surge on the Allegheny as a threat to endangered bats and hellbenders; works this ground at Los Padres National Forest: Plaintiff in the 2020 suit that halted new federal oil leasing across the Los Padres region.

    Source ↗
  • Alaska Wilderness League

    Works this ground · not linked to this decision

    Works this ground at Tongass National Forest: Works the Tongass and the Roadless Rule fight in Washington.

    Source ↗
  • Backcountry Hunters & Anglers

    Works this ground · not linked to this decision

    Works this ground at Ruby Mountains: Nevada chapter organized within the 15-group Sportsmen for the Rubies coalition against oil and gas leasing and backs permanent withdrawal through the Ruby Mountains Protection Act.

    Source ↗
  • Oregon Wild

    Works this ground · not linked to this decision

    Works this ground at Blue Mountains National Forests: Runs the Protect the Blue Mountains comment page for this plan revision.

    Source ↗
  • Trout Unlimited

    Works this ground · not linked to this decision

    Works this ground at Ruby Mountains: Member of the Sportsmen for the Rubies coalition, which welcomed the December 2024 order pausing oil and gas leasing in the Ruby Mountains for two years and is pushing the Ruby Mountains Protection Act to make it permanent.

    Source ↗
  • Earthjustice

    Works this ground · not linked to this decision

    Works this ground at Green Mountain National Forest: Wrote technical comments opposing the Telephone Gap timber sale and mobilized public opposition alongside Standing Trees; works this ground at Los Padres National Forest: Filed the 2020 suit for ForestWatch and allied groups that blocked new federal oil leasing in the region.

    Source ↗
  • Environment America

    Works this ground · not linked to this decision

    Works this ground at Allegheny National Forest: Its Pennsylvania arm documented the forest's exposure to logging and gas drilling in a dedicated report.

    Source ↗
  • Friends of the Earth

    Works this ground · not linked to this decision

    Works this ground at Los Padres National Forest: Joined the coalition suit that halted new oil and gas leasing across the Los Padres region.

    Source ↗
  • Natural Resources Defense Council

    Works this ground · not linked to this decision

    Works this ground at Tongass National Forest: Party to the Tongass Roadless Rule litigation.

    Source ↗
  • Southern Environmental Law Center

    Works this ground · not linked to this decision

    Works this ground at Mark Twain National Forest: Its February 2024 timber targets lawsuit charges the Forest Service with ignoring the cumulative climate impacts of logging projects including one on the Mark Twain National Forest.

    Source ↗
  • The Conservation Fund

    Works this ground · not linked to this decision

    Works this ground at Mark Twain National Forest: Has conveyed more than 2,000 acres into the forest, including Current River frontage in 2016 and 229 acres at Piney Creek Wilderness in 2018.

    Source ↗
  • Theodore Roosevelt Conservation Partnership

    Works this ground · not linked to this decision

    Works this ground at Ruby Mountains: Its Nevada field representative advocated for the Ruby Mountains oil and gas withdrawal as part of the sportsmen's coalition celebrating the December 2024 moratorium.

    Source ↗

Every group above is on STAND for Public Lands, with its court record, its filings and who backs it.

The Forest Service wants to rescind the 2001 Roadless Rule and remove protections from 44.7 million acres of national forest, including 9.3 million acres in Alaska's Tongass, opening them to new roads and logging.

What’s at risk

The agency's own preliminary biological assessment found the rescission likely to adversely affect 327 ESA-listed species and 71 critical habitats, and the operable timberland it would open is mostly mature or old-growth forest (11-16 percent old growth, 54-63 percent mature). Water for millions of people, including nearly 5 million in the Pacific Southwest Region alone, flows from watersheds inside these roadless areas, and the road system the agency wants to expand already carries a $6.9 billion maintenance backlog it cannot fund.

If this goes through

Rescinding the rule would let local officials authorize new permanent and temporary roads and could raise sawtimber harvest 5 to 10 percent above today's 5.5 million ccf per year, with a final rule targeted for 2027. Separate law already requires the Forest Service to sell at least 250 million more board feet of timber every year through fiscal year 2034, so this rescission would compound a harvest increase already locked in by statute, and the changes remain in place until another rulemaking or Congress acts.

Our plain-English read of the official notice ↗. Check it against the agency’s own words below.

By the numbers, from the agency’s own document

Acres losing roadless protection (Alt. 2)
44.7 million acres (incl. 9.3M in Tongass) go to 0 protected
Alternative 2 – 2001 Roadless Rule Recission (Repeal)/No Rule

“Removes IRA designation from 44.7 million acres, including 9.3 million on the Tongass National Forest”

Open the document ↗
Sawtimber harvest increase vs. today
+5-10% above current 5.5 million ccf/year nationally
Potential annual harvest levels

“a potential 5 to 10 percent increase in total sawtimber harvest on National Forest System lands compared to current harvest levels”

Open the document ↗
ESA species/habitats likely adversely affected
327 species and 71 critical habitats
Table 3. Comparison of effects

“Based on preliminary draft biological assessment, “may affect, and is likely to adversely affect” 327 ESA-listed species and 71 critical habitats”

Open the document ↗
New permanent road miles built in IRAs since 2013
~60 miles (against 9,500 miles already there)
2001 Roadless Area Conservation Rule Implementation

“Best available records of permanent road construction indicate that approximately 60 miles of roads were built within inventoried roadless areas after 2013”

Open the document ↗
Statutory minimum annual timber sale increase, FY2026-34
at least 250 million board feet more every year
Table 4. Ongoing and reasonably foreseeable actions

“sell a quantity of timber on National Forest System land that is at least 250 million board feet greater than the quantity that was sold”

Open the document ↗

Each figure is checked word for word against the decision document ↗; open a label to read the sentence it comes from and the document it’s in.

The agency’s case, tested

What the agency argues, and whether its own record backs it

3
Hold up
4
No support given

The Agriculture Department proposes to repeal the 2001 Roadless Rule on about 44.7 million acres of national forest, including the Tongass. It says a single national ban limits local managers' flexibility to deal with wildfire, insects and disease, and that local forest plans are better suited to decide where roads and logging belong.

“The Department is proposing this rule rescission to reduce regulatory burden and return land management decision-making for inventoried roadless areas to local Forest Service officials.”

Purpose and Need for Action

  • Purpose and need

    No support given

    The Roadless Rule limited vegetation management and contributed to a lack of active management that hurt forest health.

    The document supports that the rule limited management. Timber harvest averaged about 500 acres a year, mechanical fuel work was limited, and the text says roadless designation is widely seen as a barrier to mechanical treatment. But it also cites research finding the rule didn't meaningfully constrain fuel treatments as a share of forested land. It also says insect and disease risk in western roadless areas is similar to or lower than on managed forest land.

    The agency’s words, the record +

    The agency says

    “The 2001 Roadless Rule limited the Forest Service’s ability to conduct vegetation management within inventoried roadless areas and has contributed to the lack of active management of the national forests, which has contributed to challenges in addressing forest health concerns.”

    Rationale for the Proposed Rule

    Elsewhere in the same document

    “Insect and disease risk is generally higher in western regions; in western forests, the percent of forests at risk is similar or lower in potentially affected IRAs when compared to NFS forests outside of designated areas.”

    Insect and Disease

  • Effects

    No support given

    New roads in roadless areas would raise initial attack success and shrink fire sizes and durations.

    Table 24 shows initial attack success of 94.4 percent in roadless areas versus 97.2 percent on other forest land. Table 26 shows that higher-standard roads helped contain fires. But the document says this comparison ignores that less-than-full suppression is used more often in roadless areas. It also expects most new roads to be temporary timber spurs rather than strategic fire roads. No analysis isolates the effect of roads.

    The agency’s words, the record and the law +

    The agency says

    “With increased road access, initial attack success rates would be expected to increase.”

    Fire Control

    Elsewhere in the same document

    “However, this analysis does not account for fire management objectives and strategies (opportunities that may include less-than-full-suppression tactics).”

    Fire Control

    “New permanent road construction, strategically planned to support fuels and fire objectives, is less likely to be widespread within potentially affected IRAs, given the costs of road construction costs, maintenance funding limitations, constraints on placement of roads, and current land management plan restrictions.”

    Fire Control

    The law

    “a detailed statement by the responsible official on- (i) reasonably foreseeable environmental effects of the proposed agency action; (ii) any reasonably foreseeable adverse environmental effects which cannot be avoided should the proposal be implemented;” National Environmental Policy Act, 42 U.S.C. 4332(2)(C) ↗

  • Economics

    No support given

    Losses to recreationists and to recreation spending near roadless areas would be small, a few million dollars a year nationally.

    The agency ties the loss to the less than 1 percent of operable land harvested in a year. But roads and shifts in recreation settings accumulate and last. The Recreation section says about 52 percent of three setting classes are more likely to be affected. The same section also says the magnitude of losses is unknown. The estimate is set against roadless recreation benefits of upwards of $1.5 billion.

    The agency’s words, the record +

    The agency says

    “Assuming an upper limit of a 1 percent annual loss of economic benefit within the likely operable and likely operable but complex areas translates into potential annual losses for trail and dispersed area recreation of $4.8 million and $1.3 million for wildlife-related recreation, nationally.”

    Economic Benefits from Recreation in Roadless Area Forests

    Elsewhere in the same document

    “The magnitude of those losses is unknown, but it is likely those losses would be greater under this alternative compared to either alternative 1 or 3.”

    Economic Benefits from Recreation in Roadless Area Forests

    “An average of about 52 percent of semi-primitive non-motorized, semi-primitive motorized, and roaded natural ROS settings within the alternative 2 affected area are more likely to be impacted.”

    Recreation Opportunities and Setting

  • Show 1 more claim +
    • Science

      No support given

      The 2020 Alaska Roadless Rule environmental impact statement still adequately describes the effects of removing roadless protection on the Tongass.

      Appendix 4 reviews new executive orders, the 2025 plan assessment, a mine expansion, cruise tourism and insect outbreaks, and finds they don't change the 2020 effects. It also says the projected timber sale quantity is unchanged, so total harvest stays the same. But the 2020 figures, such as a gain of about 168,000 acres of suitable old growth, assume a timber suitability change to the Tongass plan that the document says was never issued. The new long-term timber demand analysis isn't finished, and the 2020 analysis didn't address fire and fuels.

      The agency’s words, the record and the law +

      The agency says

      “The potential new information and changed circumstances have been found to result in no substantial changes to the analysis and the analysis remains adequate.”

      Adequacy of Effects Analysis for the Proposed Action

      Elsewhere in the same document

      “The Alaska Roadless Rule, as analyzed in the 2020 FEIS, would expand the suitable areas, due to inclusion of an administrative change to the Tongass Forest Plan.”

      Potential Timber Resources and Forest Products

      “In addition, in accordance with the 1990 Tongass Timber Reform Act (TTRA), a new long-term timber demand analysis is underway at the USDA Forest Service Pacific Northwest Research Station to inform the revised plan.”

      Tongass National Forest Plan Assessment

      The law

      “ensure the professional integrity, including scientific integrity, of the discussion and analysis in an environmental document; (E) make use of reliable data and resources in carrying out this chapter;” National Environmental Policy Act, 42 U.S.C. 4332(2)(D)-(E) ↗

Where its own record backs the agency

  • AlternativesKeeping national roadless boundaries while loosening prohibitions was rejected because national boundaries impose an administrative and legal burden and restrict local discretion.Why it holds +

    The Implementation section backs the burden point. It says exception use was limited partly by rigorous project-level analysis and review requirements. Alternative 3 keeps national boundaries on about 13 million acres, but it removes them on 31.7 million acres and adds locally led boundary changes. The rejected alternative kept all 44.7 million acres under national boundaries, so the two aren't equivalent. The tension is a matter of degree.

    The agency says

    “In addition, maintaining national roadless boundaries would require project-level analysis considerations of roadless values which have been, and would continue to be an administrative and legal burden for the agency.”

    Alternatives That Would Modify the Rule Prohibitions or Exceptions

    Its own record backs it

    “The alternatives presented in detail below represent a reasonable range of rulemaking alternatives that are technically and economically feasible and consistent with the stated purpose and need.”

    Proposed Action and Alternatives

    “In addition, alternative 3 would continue the existing Rule’s exceptions and provides for locally led boundary modifications which could enable local units to propose adjustments where the nationally derived boundaries do not align with local data or conditions.”

    Alternatives With a Different Geographic Scope of the Rule

  • EffectsRepeal or the modified rule would open more opportunities for hazardous fuel treatment in high-priority firesheds.Why it holds +

    Table 22 shows 7,236,418 acres of roadless land in high-priority firesheds. Table 28 shows about 16.4 percent of that is likely operable and 35.3 percent is likely operable but complex. That supports added opportunity. The Social and Economic section adds that road costs and declining budgets mean the overall increase in treatment capacity would be modest.

    The agency says

    “Alternatives 2 and 3 would provide additional opportunities for hazardous fuel treatments in priority firesheds and other high-risk areas, when compared with alternative 1.”

    Conclusion

    Its own record backs it

    “Approximately 3.6 million acres (52 percent) of the high priority firesheds in the potentially affected IRAs are in the likely operable or operable-but-complex condition, meaning that mechanical fuels reduction activity could be feasible.”

    Hazardous Fuels Reduction

  • EffectsExisting forest plans and project design would reduce or mitigate the harms of new roads and logging.Why it holds +

    The claim only says effects could be reduced or mitigated, and the document backs that. Plans further restrict road construction on 21.8 million acres (54.5 percent) and timber harvest on 26.7 million acres (66.5 percent) of affected roadless land. Monitoring shows best management practice compliance between 85 percent and 98 percent. Still, 108 of 126 plans were developed under the 1982 regulations, many are less likely to address roadless areas, and the document doesn't measure how much harm plans would prevent.

    The agency says

    “Across all alternatives, potential adverse effects could be reduced or mitigated by existing land management plans and individual project design.”

    Comparison of Alternatives

    Its own record backs it

    “Therefore, these plans are less likely to have incorporated IRAs into their management areas or provided specific direction for these areas.”

    Relationship of the 2001 Roadless Rule to Land Management Planning

    “Land management plan direction allows or generally allows road construction across 44.5 percent of the potentially affected environment (see also Appendix 1 – IRA Acreage Summarized by Region).”

    National Forest Transportation System

Read from the agency’s own decision document ↗, all 333 pages. Every quote is checked word for word against it, a claim marked contradicted stands on a quote from the same document, and a second reading argued the agency’s side of every verdict before it was published. The verdicts are our reading; the quotes are the agency’s. A court can set aside agency action it finds “arbitrary, capricious, an abuse of discretion, or otherwise not in accordance with law” (5 U.S.C. 706(2)(A) ↗), which is why these gaps are worth putting in the record.

What to say

What the public could have raised, from the agency’s own document

  • I oppose this action as proposed, and I ask the agency to weigh the specific harms below.
  • The draft EIS's Scope of the Analysis section flatly states that none of the alternatives would cause an irreversible or irretrievable commitment of resources, but the same document discloses that the rescission is likely to adversely affect 327 ESA-listed species and 71 critical habitats and that permanent road construction and old-growth removal are reasonably foreseeable elsewhere in the effects chapters. The agency cannot credibly disclaim any irreversible resource commitment while its own analysis predicts exactly that. The Forest Service should revise this section to honestly disclose and analyze the irreversible and irretrievable commitments described in its own biodiversity, vegetation, and roads chapters, or explain the contradiction.
  • The agency reports that a preliminary biological assessment found the rescission likely to adversely affect 327 ESA-listed species and 71 designated critical habitats, but formal Section 7 consultation with the Fish and Wildlife Service and NOAA Fisheries has not been completed. Basing a nationwide rulemaking decision on preliminary, unconsulted findings covering hundreds of species means the public cannot know whether the final Biological Opinion will require different alternatives, mitigation, or a jeopardy finding. The Forest Service should complete ESA consultation and disclose the resulting Biological Opinion before finalizing this rule.
  • The purpose and need argues that the 2001 Roadless Rule limited vegetation management and contributed to forest-health problems, but the agency's own Fire and Fuels Management chapter cites research finding that the Roadless Rule did not meaningfully constrain hazardous fuel treatment activities when measured as a share of forested land treated. The document's own cited evidence contradicts the central justification offered for rescinding the rule. The Forest Service should reconcile this contradiction and justify the purpose and need with data rather than an unsupported claim that roadless status caused a forest-health crisis.
  • Even under full rescission, existing land management plans independently restrict timber harvest on 26.7 million acres, or 66.5 percent, of the potentially affected IRAs and restrict road construction on more than half the acreage, regardless of the Roadless Rule's status. If most of the land is already off-limits under plan direction that would survive rescission, the agency has not shown that eliminating the national rule delivers the forest-health and timber benefits it claims. The Forest Service should quantify what rescission actually adds beyond existing plan restrictions before relying on those benefits to justify the rule.
Show every point from the document
  • The agency's own activity-tracking data show that timber harvest within potentially affected IRAs has averaged only about 500 acres per year, with volume inconsequential to overall nationwide harvest levels, across the 44.7 million acres covered by the rule. That trivial historical harvest level undercuts the claim that roadless prohibitions are a meaningful driver of the national forest-health and timber-supply problems the agency describes. The Forest Service should explain, with data, how opening land that has produced inconsequential harvest volume for over two decades will now deliver the promised benefits.
  • The agency touts fire-control benefits from new roads in roadless areas, but its own data show that nationally only 23.5 percent of Forest Service road length that intersected wildfires was associated with successful containment, with success rates as low as 12.7 to 20.8 percent on the lower-maintenance-level roads that are most likely to be built in these remote areas. Because the DEIS elsewhere states that new roads in IRAs would mostly be temporary, low-standard spur roads, the type of road most likely to actually be built is the type least associated with successful containment in the agency's own analysis. The Forest Service should not cite general fire-control benefits without confronting this road-class-specific containment data.
  • The agency admits it does not track when requests for exceptions under the current rule were abandoned or not approved, and separately concedes its tally of documented exception proposals since 2018 excludes approvals made below the regional forester level. The entire narrative that roadless exceptions have been limited and inconsistent rests on this incomplete record-keeping. The Forest Service should compile complete national data on how the existing exception process has actually been used before relying on that history to justify eliminating the underlying prohibitions.
  • Of the more than 220,000 comment letters (representing over 625,000 signatures) received on the Notice of Intent, approximately 99 percent were generally opposed to the proposed rescission while approximately 1 percent were generally in support, yet that comment window lasted only 21 days. Near-unanimous documented opposition, generated during an unusually short notice period, warrants a longer public comment window on the actual draft EIS and proposed rule text. The Forest Service should extend the comment period given the scale of opposition already on record.
  • The agency proposes to authorize new permanent road construction in currently roadless areas while its own transportation chapter discloses a 2024 deferred maintenance backlog of $6.9 billion for roads and bridges, funded at less than 20 percent of the annual need. Adding new permanent road mileage to a system the agency cannot currently afford to maintain will deepen this backlog and, as the DEIS itself acknowledges, could require shifting funding between regions. The Forest Service should disclose how new road construction and its maintenance will be funded given the existing $6.9 billion backlog before finalizing a rule that foreseeably expands the road network.
  • In the operable areas most likely to be logged under the proposed action, the agency's own data show that roughly 11 to 16 percent is old-growth forest and 54 to 63 percent is mature forest, meaning old and mature stands make up the large majority of the timberland the rule would open. The DEIS does not identify any old-growth-specific protection beyond general land management plan compliance before these irreplaceable stands could be harvested. The Forest Service should separately analyze and disclose old-growth-specific safeguards before authorizing timber harvest in this largely mature and old-growth land base.
  • Say something only you can say. The law requires the agency to consider and respond to substantive comments, and specifics are what make a comment substantive.
Every point is checked against the agency’s own decision document ↗. 10 findings verified against the text, word for word.

The science the analysis never cites

We checked every entry in the government’s own reference lists (the Cost Benefit Analysis, 52 entries, and Draft EIS Volume I, 388 entries) against the peer-reviewed and federal science we hold on this fight. Each paper below appears in neither list, and its lead author appears nowhere in either document’s text.

The 12 strongest of 51 such papers, ranked by relevance to this analysis and standing in the literature

  1. Changing wildfire, changing forests: the effects of climate change on fire regimes and vegetation in the Pacific Northwest, USA ↗

    Jessica E. Halofsky; David L. Peterson; Brian J. Harvey, 2020 · Fire Ecology · cited by 625 other works (OpenAlex)

    From the paper’s abstractWildfires in the Pacific Northwest (Washington, Oregon, Idaho, and western Montana, USA) have been immense in recent years, capturing the attention of resource managers, fire scientists, and the general public.
  2. Effects of Roads on Hydrology, Geomorphology, and Disturbance Patches in Stream Networks ↗

    Julia Jones; Frederick J. Swanson; Beverley Wemple et al., 2000 · Conservation Biology · cited by 411 other works (OpenAlex)

    From the paper’s abstractWe outline a view of how road networks interact with stream networks at the landscape scale and, based on examples from recent and current research, illustrate how these interactions might affect biological and ecological processes in stream and riparian systems.
  3. Hydrology of tropical montane cloud forests: A Reassessment ↗

    L. A. Bruijnzeel; Bruijnzeel, L.A., 2001 · AgEcon Search (University of Minnesota, USA) · cited by 220 other works (OpenAlex)

    From the paper’s abstractExtending an earlier review of the literature (Bruijnzeel and Proctor, 1995), this paper incorporates the results obtained by post-1993 hydrological and hydrometeorological studies in tropical montane cloud forests (TMCF) situated mostly in Latin America and the Caribbean.
  4. Salamander Abundance along Road Edges and within Abandoned Logging Roads in Appalachian Forests ↗

    Raymond D. Semlitsch; Travis J. Ryan; Kevin Hamed et al., 2006 · Conservation Biology · cited by 99 other works (OpenAlex)

    From the paper’s abstractRoads may be one of the most common disturbances in otherwise continuous forested habitat in the southern Appalachian Mountains. Despite their obvious presence on the landscape, there is limited data on the ecological effects along a road edge or the size of the "road-effect zone." We sampled salamanders at current and abandoned road sites within the Nantahala National Forest, North Carolina (U.S.A.
  5. Forest Accessibility and Road Network Density: A Global Overview with a Special Focus on Europe ↗

    Andreja Đuka; Ivica Papa; Andrea Rosario Proto et al., 2025 · Current Forestry Reports · cited by 9 other works (OpenAlex)

    From the paper’s abstractof the Review Forest accessibility and road network density are important concerns not only for forest managers, but also for everyone who benefits from forests, whether for professional or personal use. A well-planned forest road network, integrated with the forest ecosystem, is a fundamental element of rational and efficient forest management.
Show 7 more ▾
  1. Quantifying the National Significance of Local Areas for Regional Conservation Planning: North Carolina’s Mountain Treasures ↗

    R. Travis Belote; Gareth Irwin, 2017 · Land · cited by 5 other works (OpenAlex)

    From the paper’s abstractConservation scientists recognize that additional protected areas are needed to maintain biological diversity and ecological processes. As regional conservation planners embark on recommending additional areas for protection in formal ecological reserves, it is important to evaluate candidate lands for their role in building a resilient protected areas system of the future.
  2. The Role of Sociodemographic Characteristics in Expert Perceptions of the Ecological Impacts of Forest Roads ↗

    Saliha Ünver Okan; Oğuz Kurdoğlu; Emre Küçükbeki̇r et al., 2026 · European Journal of Forest Engineering

    From the paper’s abstractThis study examined whether experts’ perceptions of the ecological impacts of forest roads differed by age, gender, professional experience, and sector of employment. The research involved 120 participants from civil engineering, forestry engineering, landscape architecture, and urban and regional planning.
  3. Policies and strategies to protect old-growth forests in Ontario ↗

    Peter Quinby; Ania Marcus; Katie Krelove, 2026 · Canadian Planning and Policy / Aménagement et politique au Canada

    From the paper’s abstractUsing a case study approach, we focused on the three main policy mechanisms to protect primary forests in Ontario including: (1) applying Forest Stewardship Council Standards, (2) participating as a stakeholder in forest management planning through the Crown Forest Sustainability Act, and (3) pursuing a Crown Land Use Amendment.
  4. Protocol for route restoration in California’s desert renewable energy conservation plan area ↗

    2021 · Techniques and Methods

    From the paper’s abstractIn the deserts of the Southwestern United States, increased off-highway vehicle use can lead to widespread vehicular damage to desert ecosystems. As the popularity and intensity of vehicle use on public lands continues, the Bureau of Land Management (BLM) is challenged to manage the routes used by recreationists while minimizing activity beyond designated routes and mitigating environmental impacts.
  5. Mineral resource potential of national forest RARE II and wilderness areas in Montana ↗

    1984 · Open-File Report

    From the paper’s abstractUNITED STATES DEPARTMENT OF THE INTERIOR GEOLOGICAL SURVEY Mineral resource potential of national forest RARE II and wilderness areas in Montana Compiled by 1 2 Christopher E. Williams and Robert C. Pearson Open-File Report 84-637 1984 This report is preliminary and has not been reviewed for conformity with U.S. Geological Survey editorial standards and stratigraphic nomenclature.
  6. Using simulated historical time series to prioritize fuel treatments on landscapes across the United States: The LANDFIRE prototype project ↗

    2007 · Ecological Modelling

    From the paper’s abstractCanopy and surface fuels in many fire-prone forests of the United States have increased over the last 70 years as a result of modern fire exclusion policies, grazing, and other land management activities. The Healthy Forest Restoration Act and National Fire Plan establish a national commitment to reduce fire hazard and restore fire-adapted ecosystems across the USA.
  7. Petroleum potential of designated versus proposed wilderness lands in the Western United States ↗

    1984 · Open-File Report

    From the paper’s abstractUNITED STATES DEPARTMENT OF THE INTERIOR GEOLOGICAL SURVEY PETROLEUM POTENTIAL OF DESIGNATED VERSUS PROPOSED WILDERNESS LANDS IN THE WESTERN UNITED STATES Robert A. Crovelli Open-File Report 84-363 This report is preliminary and has not been reviewed for conformity with U.S. Geological Survey editorial standards CONTENTS Page Introduction..........................................................

The claim here is deliberately narrow. Absence from a reference list is a checkable fact; the agency may have weighed work it doesn’t list. While the window was open, raising one of these studies obliged the agency to answer it in writing. This list stays as the record of what the analysis left out.

In the agency’s own words

The U.S. Department of Agriculture (USDA or Department) is proposing to rescind the 2001 Roadless Area Conservation Rule (2001 Roadless Rule), which established broad prohibitions on road construction, road reconstruction, and timber harvesting within inventoried roadless areas on National Forest System lands. The intent of this proposed action is to reduce regulatory burden and return decisionmaking for the management of inventoried roadless areas to the land management planning process at the individual national forest level. Rescission of the national-level prohibitions provides responsible officials with flex…

Federal Register 2026-16965 ↗

On the record for this fight

39 people have filed on this fight through PLAN, and 33 have been found on the agency’s own posted comments.

  1. AyreAnna, California13 seals
  2. Judith A.27 seals
  3. Milton M.39 seals
  4. Patricia, Colorado11 seals
  5. Jeff, Colorado11 seals
  6. Karen W.49 seals
  7. Al, California36 seals
  8. Emily, California32 seals
  9. and 30 more stewards

Ranked on letters found on the agency’s record, then letters filed. Readers appear as first name and last initial, or as a steward in their state; switch yours off in your record. All boards

Did the agency answer?

10 issues are on this record. The agency has not published its decision document yet, so each one stays pending until the agency answers.

Issues on the record, awaiting the decision

  • PendingThe draft EIS's Scope of the Analysis section flatly states that none of the alternatives would cause an irreversible or irretrievable commitment of resources, but the same document discloses that the

    The draft EIS's Scope of the Analysis section flatly states that none of the alternatives would cause an irreversible or irretrievable commitment of resources, but the same document discloses that the rescission is likely to adversely affect 327 ESA-listed species and 71 critical habitats and that permanent road construction and old-growth removal are reasonably foreseeable elsewhere in the effects chapters. The agency cannot credibly disclaim any irreversible resource commitment while its own analysis predicts exactly that. The Forest Service should revise this section to honestly disclose and analyze the irreversible and irretrievable commitments described in its own biodiversity, vegetation, and roads chapters, or explain the contradiction.

    A hole PLAN found in the agency’s own analysis, quote verified against the document

  • PendingThe agency reports that a preliminary biological assessment found the rescission likely to adversely affect 327 ESA-listed species and 71 designated critical habitats, but formal Section 7 consultatio

    The agency reports that a preliminary biological assessment found the rescission likely to adversely affect 327 ESA-listed species and 71 designated critical habitats, but formal Section 7 consultation with the Fish and Wildlife Service and NOAA Fisheries has not been completed. Basing a nationwide rulemaking decision on preliminary, unconsulted findings covering hundreds of species means the public cannot know whether the final Biological Opinion will require different alternatives, mitigation, or a jeopardy finding. The Forest Service should complete ESA consultation and disclose the resulting Biological Opinion before finalizing this rule.

    A hole PLAN found in the agency’s own analysis, quote verified against the document

  • PendingThe purpose and need argues that the 2001 Roadless Rule limited vegetation management and contributed to forest-health problems, but the agency's own Fire and Fuels Management chapter cites research f

    The purpose and need argues that the 2001 Roadless Rule limited vegetation management and contributed to forest-health problems, but the agency's own Fire and Fuels Management chapter cites research finding that the Roadless Rule did not meaningfully constrain hazardous fuel treatment activities when measured as a share of forested land treated. The document's own cited evidence contradicts the central justification offered for rescinding the rule. The Forest Service should reconcile this contradiction and justify the purpose and need with data rather than an unsupported claim that roadless status caused a forest-health crisis.

    A hole PLAN found in the agency’s own analysis, quote verified against the document

  • PendingEven under full rescission, existing land management plans independently restrict timber harvest on 26.7 million acres, or 66.5 percent, of the potentially affected IRAs and restrict road construction

    Even under full rescission, existing land management plans independently restrict timber harvest on 26.7 million acres, or 66.5 percent, of the potentially affected IRAs and restrict road construction on more than half the acreage, regardless of the Roadless Rule's status. If most of the land is already off-limits under plan direction that would survive rescission, the agency has not shown that eliminating the national rule delivers the forest-health and timber benefits it claims. The Forest Service should quantify what rescission actually adds beyond existing plan restrictions before relying on those benefits to justify the rule.

    A hole PLAN found in the agency’s own analysis, quote verified against the document

  • PendingThe agency's own activity-tracking data show that timber harvest within potentially affected IRAs has averaged only about 500 acres per year, with volume inconsequential to overall nationwide harvest

    The agency's own activity-tracking data show that timber harvest within potentially affected IRAs has averaged only about 500 acres per year, with volume inconsequential to overall nationwide harvest levels, across the 44.7 million acres covered by the rule. That trivial historical harvest level undercuts the claim that roadless prohibitions are a meaningful driver of the national forest-health and timber-supply problems the agency describes. The Forest Service should explain, with data, how opening land that has produced inconsequential harvest volume for over two decades will now deliver the promised benefits.

    A hole PLAN found in the agency’s own analysis, quote verified against the document

  • PendingThe agency touts fire-control benefits from new roads in roadless areas, but its own data show that nationally only 23.5 percent of Forest Service road length that intersected wildfires was associated

    The agency touts fire-control benefits from new roads in roadless areas, but its own data show that nationally only 23.5 percent of Forest Service road length that intersected wildfires was associated with successful containment, with success rates as low as 12.7 to 20.8 percent on the lower-maintenance-level roads that are most likely to be built in these remote areas. Because the DEIS elsewhere states that new roads in IRAs would mostly be temporary, low-standard spur roads, the type of road most likely to actually be built is the type least associated with successful containment in the agency's own analysis. The Forest Service should not cite general fire-control benefits without confronting this road-class-specific containment data.

    A hole PLAN found in the agency’s own analysis, quote verified against the document

  • PendingThe agency admits it does not track when requests for exceptions under the current rule were abandoned or not approved, and separately concedes its tally of documented exception proposals since 2018 e

    The agency admits it does not track when requests for exceptions under the current rule were abandoned or not approved, and separately concedes its tally of documented exception proposals since 2018 excludes approvals made below the regional forester level. The entire narrative that roadless exceptions have been limited and inconsistent rests on this incomplete record-keeping. The Forest Service should compile complete national data on how the existing exception process has actually been used before relying on that history to justify eliminating the underlying prohibitions.

    A hole PLAN found in the agency’s own analysis, quote verified against the document

  • PendingOf the more than 220,000 comment letters (representing over 625,000 signatures) received on the Notice of Intent, approximately 99 percent were generally opposed to the proposed rescission while appro

    Of the more than 220,000 comment letters (representing over 625,000 signatures) received on the Notice of Intent, approximately 99 percent were generally opposed to the proposed rescission while approximately 1 percent were generally in support, yet that comment window lasted only 21 days. Near-unanimous documented opposition, generated during an unusually short notice period, warrants a longer public comment window on the actual draft EIS and proposed rule text. The Forest Service should extend the comment period given the scale of opposition already on record.

    A hole PLAN found in the agency’s own analysis, quote verified against the document

  • PendingThe agency proposes to authorize new permanent road construction in currently roadless areas while its own transportation chapter discloses a 2024 deferred maintenance backlog of $6.9 billion for road

    The agency proposes to authorize new permanent road construction in currently roadless areas while its own transportation chapter discloses a 2024 deferred maintenance backlog of $6.9 billion for roads and bridges, funded at less than 20 percent of the annual need. Adding new permanent road mileage to a system the agency cannot currently afford to maintain will deepen this backlog and, as the DEIS itself acknowledges, could require shifting funding between regions. The Forest Service should disclose how new road construction and its maintenance will be funded given the existing $6.9 billion backlog before finalizing a rule that foreseeably expands the road network.

    A hole PLAN found in the agency’s own analysis, quote verified against the document

  • PendingIn the operable areas most likely to be logged under the proposed action, the agency's own data show that roughly 11 to 16 percent is old-growth forest and 54 to 63 percent is mature forest, meaning o

    In the operable areas most likely to be logged under the proposed action, the agency's own data show that roughly 11 to 16 percent is old-growth forest and 54 to 63 percent is mature forest, meaning old and mature stands make up the large majority of the timberland the rule would open. The DEIS does not identify any old-growth-specific protection beyond general land management plan compliance before these irreplaceable stands could be harvested. The Forest Service should separately analyze and disclose old-growth-specific safeguards before authorizing timber harvest in this largely mature and old-growth land base.

    A hole PLAN found in the agency’s own analysis, quote verified against the document

The reporting behind this

From More Than Just Parks

More actions that need you

Go deeper, free

A wrong fact, a dead link, a form that wouldn’t take your letter: one tap and it comes to the people who build PLAN, with this fight attached.

Know an open comment period we are missing, or spotted a wrong deadline? .

Who signed this

Stephen Alexander Vaden

Deputy Secretary, U.S. Department of Agriculture

A person signed this, not an agency. The window has closed and the signature stands, which is exactly when accountability matters.

What to say

Short is better. You are asking Deputy Secretary Vaden to answer for a decision their office made.

My name is [your name] and I'm calling from [your city and state]. Stephen Alexander Vaden, Deputy Secretary, U.S. Department of Agriculture, signed the decision on Stop the plan to strip roadless protection from 44.7 million acres. I'm asking that office to answer for it publicly. Please record that I called and tell me what the office intends to do.

Official channels only, about this decision. No personal phone numbers, no home addresses, no personal social accounts, and nothing abusive. The point is to make the office answer, and an abusive call is the one thing that lets it off the hook.