More Than Just ParksData Center TrackerPowered byPublic Lands Intelligence

Data centers by state

New Hampshire

14 data centers we can tie to a public record, and 2 more that were stopped. 1 sits within 10 miles of protected public land. The map draws 2; 12 small sites are listed below but not drawn.

2 proposed 0 under construction 12 operating plus 2 stopped

Open New Hampshire on the map

NASA Black Marble · © OpenStreetMap

Find data centers near you in New Hampshire

Type your ZIP code or your town and you’ll see what’s proposed, going up and already running near it, and how close each one sits to protected land. A ZIP opens its own page you can bookmark and share.

Know of a data center we’re missing? Tell us.

Nothing goes on the map until a public record backs it up.

Who’s building in New Hampshire

  1. Consolidated Communications2 sites
  2. Consolidated Communications / Fidium2 sites
  3. Granite Shore Power1 site
  4. FirstLight Fiber1 site
  5. FirstLight1 site
  6. Northpoint Engineering, LLC1 site
  7. Comcast1 site
  8. Peregrine Networks (formerly Spectra Access)1 site

Proposed data centers in New Hampshire

2 proposed data centers are on the record in New Hampshire. By county, then name.

  1. Locke Road Micro Data CenterMerrimack County · Unsized
  2. Merrimack Station Data Center (Granite Shore Power)Merrimack County · Large · 350 MW

Data centers operating in New Hampshire

12 data centers are operating in New Hampshire. By county, then name.

  1. Fidium (FairPoint) Laconia Data CenterBelknap County · Small
  2. Dartmouth-Hitchcock Health ITGrafton County · Small
  3. FirstLight LebanonGrafton County · Small
  4. SNS Littleton Data CenterGrafton County · Small
  5. ColoSpace Bedford Data CenterHillsborough County · Small
  6. Consolidated Communications Manchester HubHillsborough County · Edge · 1 MW
  7. Consolidated Communications NH HubHillsborough County · Network
  8. Fidium (Consolidated Communications) Manchester Data CenterHillsborough County · Small
  9. FirstLight Manchester NHHillsborough County · Small
  10. Spectra Access / Peregrine Networks Manchester Data CenterHillsborough County · Small
  11. Comcast Londonderry Head End Data CenterRockingham County · Network
  12. Dynamic Internet Salem Data CenterRockingham County · Small

Projects stopped or paused

2 proposed projects in New Hampshire were voted down, withdrawn, canceled or held by a moratorium. Each project’s page links the source for how it ended.

  1. Nottingham Data Center MoratoriumRockingham CountyBlocked by moratorium
  2. Nottingham Business Center Data CenterRockingham CountyWithdrawn

Closest to protected land

  1. SNS Littleton Data CenterGrafton County · Small9.4 mi

Distance is to the boundary of the nearest protected unit; open a facility to see which.

Share this page

Map of data centers in New Hampshire

Map of the 14 data centers in New Hampshire tracked by More Than Just Parks, updated October 2026
Every light is a facility we can tie to a public source, drawn October 2026. Map by More Than Just Parks, free to share and embed with the credit link.
DownloadShare cardSquareTall

Every tracked facility in New Hampshire

14 facilities across 5 counties, the busiest first. Open a county to see its facilities; each one opens its own record.

Hillsborough County 6 operating6
  1. ColoSpace Bedford Data CenterSmall
  2. Consolidated Communications Manchester HubEdge · 1 MW
  3. Consolidated Communications NH HubNetwork
  4. Fidium (Consolidated Communications) Manchester Data CenterSmall
  5. FirstLight Manchester NHSmall
  6. Spectra Access / Peregrine Networks Manchester Data CenterSmall
Grafton County 3 operating3
  1. Dartmouth-Hitchcock Health ITSmall
  2. FirstLight LebanonSmall
  3. SNS Littleton Data CenterSmall
Merrimack County 2 proposed2
  1. Locke Road Micro Data CenterUnsized
  2. Merrimack Station Data Center (Granite Shore Power)Large · 350 MW
Rockingham County 2 operating2
  1. Comcast Londonderry Head End Data CenterNetwork
  2. Dynamic Internet Salem Data CenterSmall
Belknap County 1 operating1
  1. Fidium (FairPoint) Laconia Data CenterSmall

Data centers in New Hampshire: common questions

How many data centers are in New Hampshire?
More Than Just Parks tracks 14 active data center facilities in New Hampshire, each citing a public source: 12 operating, 0 under construction and 2 proposed. 2 more were canceled, withdrawn, suspended or blocked.
How much electricity do New Hampshire's data centers use?
We don’t publish a state total, and the reason matters: about nine in ten facilities here never disclose a capacity, so any sum would look like a census of New Hampshire's data center load while leaving out the sites that stayed quiet. Each facility page shows the figure its own source states. A single large campus can draw as much power as a small city.
Are New Hampshire data centers near protected land?
1 of the tracked facilities in New Hampshire sits within 10 miles of protected public land, measured to the real boundary of the nearest national park, wilderness area, wildlife refuge or conservation area; none sit within a single mile.
Which county in New Hampshire has the most data centers?
Hillsborough County has the most, with 6 tracked data centers, followed by Grafton County (3) and Merrimack County (2).
Are there proposed data centers in New Hampshire?
Yes. We track 2 proposed data centers in New Hampshire, including Merrimack Station Data Center (Granite Shore Power) and Locke Road Micro Data Center. None of them sit within 10 miles of protected public land.
Who is building data centers in New Hampshire?
The most active operators in New Hampshire are Consolidated Communications (2 sites), Consolidated Communications / Fidium (2 sites) and Granite Shore Power (1 site), counted by sites, not megawatts.

Get alerts for New Hampshire

An email when a data center lands in the record here, proposed, breaking ground or stopped, with its size and how close it sits to protected land.

Every facility on this page cites a public record we can link to: industry reporting, facility trackers, company announcements, and local planning and utility filings, cross-referenced against protected public land. Part of the Data Center Tracker from More Than Just Parks. A facility shows a capacity only where its own source states one.

Nearby states

  1. Data centers in Massachusetts48
  2. Data centers in Maine12
  3. Data centers in Vermont7

Other states

About this data. Every entry links to the public source it’s based on. Those sources can be incomplete, provisional or out of date, and they aren’t official filings or interconnection records. Company and project attributions reflect third-party public reporting, not assertions of fact by More Than Just Parks, and nothing here is legal, financial or investment advice. Company and project names are trademarks of their respective owners, used for identification and commentary only. Found something wrong? Email ask@morethanjustparks.com and we’ll review and correct it. Night lights are NASA Black Marble, a 2016 composite, drawn for context. Data and legal notice.