More Than Just ParksData Center TrackerPowered byPublic Lands Intelligence

Data centers by state

Missouri

60 data center facilities we can tie to a public record. 9 sit within 10 miles of protected public land, 2 within 5 miles. 27 small sites are on record but not on the map.

15 proposed 6 under construction 39 operating 12 stopped

Open Missouri on the map

NASA Black Marble · © OpenStreetMap

Who’s building in Missouri

  1. TierPoint4 sites
  2. Google2 sites
  3. AAIM Data Centers2 sites
  4. Meta Platforms2 sites
  5. Beltline Energy1 site
  6. Nebius1 site
  7. Cloverleaf Infrastructure1 site
  8. Geronimo1 site

Closest to protected land

  1. USDA National IT CenterJackson County · Institutional, inferred1.2 mi
  2. Centersquare St. Louis SL1 (Hazelwood, ex-Cyxtera)St. Louis County · Mid-size, inferred3.8 mi
  3. CRG Festus Data CenterJefferson County · Unsized, inferred5.2 mi
  4. Verizon St. Louis #2 Advanced Data Center (Maryland Heights)St. Louis County · Network, inferred5.5 mi
  5. ISG Technology Columbia Underground Data CenterBoone County · Small, inferred7.0 mi
  6. AAIM Missouri 1 (Columbia)Boone County · Mid-size · 15 MW8.4 mi
  7. University of Missouri (MU) Data CenterBoone County · Institutional, inferred8.4 mi
  8. Undisclosed Data Center (Paris Road/Hinkson Creek Road site)Boone County · Unsized, inferred~8.5 mi

Distance is to the boundary of the nearest protected unit; open a row to see which.

Projects communities stopped

12 proposed projects in Missouri were defeated, withdrawn or blocked after local pushback, a moratorium or a developer’s own retreat.

  1. Emerson Electric Site Data CenterSt. Louis County · Large · 300 MWCanceled
  2. St. Charles Data Center MoratoriumSt. Charles CountyBlocked by moratorium
  3. Swarm Systems Data Center (Marshfield Industrial Park)Webster CountySuspended
  4. Project Blitz (Lambda Northland AI Data Center)Platte CountyWithdrawn
  5. Independence Data Center MoratoriumJackson CountyBlocked by moratorium
  6. Benton County Data Center MoratoriumBenton CountyBlocked by moratorium
  7. MO Lake Development Data Center (Camdenton)Camden CountyWithdrawn
  8. St. Joseph Data Center MoratoriumBuchanan CountyBlocked by moratorium
  9. Highway 370 Data CenterSt. Charles CountyWithdrawn
  10. Downtown Kansas City Data Center (Western Newspaper Union Building)Jackson CountyCanceled
  11. Pickett Road Data CenterBuchanan CountyWithdrawn
  12. Diode Ventures Peculiar (Harper Road Technology Park)Cass CountyCanceled

Share this page

Every tracked facility in Missouri

60 facilities across 20 counties and independent cities, the busiest first. Open a county for its rows; each row opens the facility.

Jackson County 1 under construction 12 operating13
  1. Nebius Independence Data CenterCampus · 800 MW
  2. 1102 Grand - Kansas CitySmall, inferred
  3. AWS Local Zone Kansas CityLarge, inferred
  4. Cerner/Oracle Health KCSmall, inferred
  5. CTC Wireless Internet Kansas City Data Center (Holly)Edge · 1 MW
  6. Involta Kansas City Enterprise CenterEdge · 4 MW
  7. IP Pathways Kansas CityEdge · 1 MW
  8. Joe's Datacenter Kansas CitySmall, inferred
  9. LightEdge Kansas City CampusSmall, inferred
  10. Oracle Health (Cerner) Kansas City Data CenterSmall, inferred
  11. Patmos AI Campus Kansas City (former Kansas City Star press building)Mid-size · 35 MW
  12. TierPoint Kansas City CampusColo, inferred
  13. USDA National IT CenterInstitutional, inferred
St. Louis City 1 proposed 1 under construction 10 operating12
  1. TierPoint St. Louis Campus ExpansionMid-size · 20 MW
  2. TerraWatt Midtown/Armory Data Center (Famous-Barr Building)Large · 120 MW
  3. AT&T St. Louis Data CenterNetwork, inferred
  4. Cybercon St. Louis Data CenterSmall, inferred
  5. Datotel St. Louis Data CenterMid-size · 18 MW
  6. H5 Data Centers St. LouisMid-size, inferred
  7. Hostirian St. Louis Data Center #1 (710 N. Tucker)Small, inferred
  8. Lumen St. Louis 1 Data Center (1015 Locust)Edge · 1 MW
  9. Netrality 900 Walnut St. Louis Carrier HotelNetwork, inferred
  10. Netrality St. Louis 210 N. Tucker CampusMid-size, inferred
  11. TierPoint St. LouisMid-size · 20 MW
  12. TierPoint St. Louis CampusMid-size, inferred
Clay County 1 proposed 1 under construction 3 operating5
  1. Google Project Mica (Clay County)Campus · 700 MW
  2. Metrobloks Liberty CampusLarge · 150 MW
  3. Edged Energy Kansas City (MCI01-1)Mid-size · 26 MW
  4. Meta Data CenterLarge, inferred
  5. NOCIX Swift Data Center (1530 Swift)Small, inferred
Boone County 1 proposed 3 operating4
  1. Undisclosed Data Center (Paris Road/Hinkson Creek Road site)Unsized, inferred
  2. AAIM Missouri 1 (Columbia)Mid-size · 15 MW
  3. ISG Technology Columbia Underground Data CenterSmall, inferred
  4. University of Missouri (MU) Data CenterInstitutional, inferred
Platte County 4 operating4
  1. Lincoln Rackhouse KC (Airworld)Small, inferred
  2. Meta Kansas CityLarge, inferred
  3. Meta Kansas City Data CenterLarge, inferred
  4. Rackspace Kansas City MC1 (Airworld)Edge · 3 MW
St. Louis County 4 operating4
  1. Ascent St Louis STL1 (Wellston)Small, inferred
  2. Centersquare St. Louis SL1 (Hazelwood, ex-Cyxtera)Mid-size, inferred
  3. Emerson Electric ITSmall, inferred
  4. Verizon St. Louis #2 Advanced Data Center (Maryland Heights)Network, inferred
Franklin County 3 proposed3
  1. Beltline Energy Data Center (Pacific)Campus · 1.2 GW
  2. Diamond Farms Data CenterUnsized, inferred
  3. Provident Data Centers (Gray Summit)Unsized, inferred
Jasper County 2 proposed2
  1. Geronimo Data Center (Jasper County)Large · 400 MW
  2. Wildwood Ranch Data Center (Joplin)Large · 200 MW
Montgomery County 2 under construction2
  1. Google Data Center Campus (Project Spade)Campus · 1.2 GW
  2. Project Green (AWS Data Center Campus, New Florence)Campus, inferred
Callaway County 1 proposed1
  1. Crusoe Callaway County Data Center (Kingdom City area)Campus, inferred
Cole County 1 operating1
  1. Missouri State Data Center (SDC)Small, inferred
Greene County 1 proposed1
  1. Lumon Solutions National Ave Data Center (Overhue)Edge · 8 MW
Jefferson County 1 proposed1
  1. CRG Festus Data CenterUnsized, inferred
Lincoln County 1 proposed1
  1. Cloverleaf Troy Campus (Cloverleaf Infrastructure)Campus · 500 MW
Nodaway County 1 proposed1
  1. ReLoad Data Center (Nodaway County)Unsized, inferred
Randolph County 1 proposed1
  1. AAIM Moberly Data CenterUnsized, inferred
Saint Louis County 1 operating1
  1. Genome Data CenterInstitutional, inferred
St. Charles County 1 operating1
  1. Mastercard O'Fallon Global Technology HubSmall, inferred
Warren County 1 proposed1
  1. Crusoe Warrenton CampusCampus, inferred
Webster County 1 under construction1
  1. Marshfield Area Data Center (Rifle Range Road)Unsized, inferred

Data centers in Missouri: common questions

How many data centers are in Missouri?
More Than Just Parks tracks 60 active data center facilities in Missouri, each citing a public source: 39 operating, 6 under construction and 15 proposed. 12 more were canceled, withdrawn or blocked.
How much electricity do Missouri's data centers use?
We don’t publish a state total, and the reason matters: roughly four in ten facilities never disclose a capacity, so any sum would look like a census of Missouri's data center load while leaving out the sites that stayed quiet. Each facility page shows the figure its own source states. A single large campus can draw as much power as a small city.
Are Missouri data centers near protected land?
9 of the tracked facilities in Missouri sit within 10 miles of protected public land, measured to the real boundary of the nearest national park, wilderness area, wildlife refuge or conservation area; 0 sit within a single mile.

Get alerts for Missouri

An email when a data center lands in the record here, proposed, breaking ground or stopped, with its size and how close it sits to protected land.

Every facility on this page cites a public record we can link to: industry reporting, facility trackers, company announcements, and local planning and utility filings, cross-referenced against protected public land. Part of the Data Center Tracker from More Than Just Parks. A row prints a capacity only where its own source states one.

Other states

About this data. Every entry links to the public source it’s based on. Those sources can be incomplete, provisional or out of date, and they aren’t official filings or interconnection records. Company and project attributions reflect third-party public reporting, not assertions of fact by More Than Just Parks, and nothing here is legal, financial or investment advice. Company and project names are trademarks of their respective owners, used for identification and commentary only. Found something wrong? Email ask@morethanjustparks.com and we’ll review and correct it. Night lights are NASA Black Marble, a 2016 composite, drawn for context. Data and legal notice.