More Than Just ParksData Center TrackerPowered byPublic Lands Intelligence

Data centers by state

Arkansas

33 data centers we can tie to a public record, and 6 more that were stopped. 5 sit within 10 miles of protected public land, 3 within 5 miles. The map draws 12; 21 small sites are listed below but not drawn.

7 proposed 5 under construction 21 operating plus 6 stopped

Open Arkansas on the map

NASA Black Marble · © OpenStreetMap

Find data centers near you in Arkansas

Type your ZIP code or your town and you’ll see what’s proposed, going up and already running near it, and how close each one sits to protected land. A ZIP opens its own page you can bookmark and share.

Know of a data center we’re missing? Tell us.

Nothing goes on the map until a public record backs it up.

Who’s building in Arkansas

  1. Google3 sites
  2. BlockOps2 sites
  3. Clean Cloud Energy (EdgeConneX identified as potential developer/buyer)1 site
  4. Bentaus (with Chadbourn Infrastructure Partners)1 site
  5. AVAIO Digital1 site
  6. OzarksGo1 site
  7. State of Arkansas1 site
  8. NewRays One LLC1 site

Proposed data centers in Arkansas

7 proposed data centers are on the record in Arkansas. By county, then name.

  1. Conway Data CenterFaulkner County · Unsized
  2. Grant County Data Center (Clean Cloud Energy / EdgeConneX, Sheridan)Grant County · Campus · 800 MW
  3. Bentaus AI Data Center - Miller CountyMiller County · Large · 200 MW
  4. Apollo Project - Helena Harbor Data CenterPhillips County · Campus · 1.0 GW
  5. Moreland Holding CryptominePope County · Unsized
  6. Google Port of Little Rock Data CenterPulaski County · Large · 100 MW
  7. Sweet Home Data Center (Google)Pulaski County · Large · 100 MW

Data centers under construction in Arkansas

5 data centers are under construction in Arkansas. By county, then name.

  1. Google, Crittenden County, ARCrittenden County · Campus
  2. Serverfarm Clarksville CampusJohnson County · Campus
  3. BlockOps Moreland Bitcoin MinePope County · Unsized
  4. AVAIO Digital LeoPulaski County · Large · 150 MW
  5. Artemis Technologies Cave City Bitcoin Data CenterSharp County · Unsized

Data centers operating in Arkansas

21 data centers are operating in Arkansas. By county, then name.

  1. Jones Digital Data Center (Jones Eagle LLC, DeWitt)Arkansas County · Small
  2. Walmart Bentonville ARBenton County · Small
  3. Wave Garden Macedonia CryptomineColumbia County · Small
  4. Ritter Communications Data Technology Center JonesboroCraighead County · Small
  5. NewRays One Bitcoin MineFaulkner County · Small
  6. ImmersionBTC Walnut Ridge MineLawrence County · Small
  7. Interstate Holdings Blockchain Cabot MineLonoke County · Small
  8. BTC Digital Manila Bitcoin Mining and Hosting Facility (BTC Digital Ltd.)Mississippi County · Small
  9. BlockOps Helena-West Helena Bitcoin Mine (Dragon Woodland sawmill site)Phillips County · Edge · 8 MW
  10. Acxiom Data Center - Little RockPulaski County · Small
  11. Arkansas State IT Data CenterPulaski County · Institutional
  12. Dillard Department Stores ITPulaski County · Small
  13. Lumen (tw telecom) Little Rock Data CenterPulaski County · Network
  14. Mainstream Technologies Little RockPulaski County · Small
  15. Sollensys Little Rock Data CenterPulaski County · Small
  16. TierPoint Little Rock ARPulaski County · Colocation
  17. Windstream Little Rock ARPulaski County · Small
  18. Searcy Information TechnologiesSearcy County · Institutional
  19. Cox Edge Johnson, ARWashington County · Small
  20. Green House Data Fayetteville CampusWashington County · Edge · 2 MW
  21. University of Arkansas HPC CenterWashington County · Institutional

Projects stopped or paused

6 proposed projects in Arkansas were voted down, withdrawn, canceled or held by a moratorium. Each project’s page links the source for how it ended.

  1. Z Squared Union County Data Center CampusUnion County · Large · 150 MWBlocked by moratorium
  2. Madison County Data Center MoratoriumMadison CountyBlocked by moratorium
  3. Russellville Data Center MoratoriumPope CountyBlocked by moratorium
  4. Green Digital Harrison Mine (proposed, withdrawn)Boone CountyWithdrawn
  5. Project Pulse - Southwest Arkansas Mega Site (Gum Springs)Clark CountyCanceled
  6. Independence County Data Center MoratoriumIndependence CountyBlocked by moratorium

Code-named projects in Arkansas

Developers often file under a code name before the company behind a project goes public. These are the ones on the record in Arkansas, with the operator where it’s been named.

  1. Project Pulse - Southwest Arkansas Mega Site (Gum Springs)DC Devco LLC (purchaser; end-user undisclosed) · Clark CountyCanceled

Closest to protected land

  1. BTC Digital Manila Bitcoin Mining and Hosting Facility (BTC Digital Ltd.)Mississippi County · Small~2.1 mi
  2. BlockOps Helena-West Helena Bitcoin Mine (Dragon Woodland sawmill site)Phillips County · Edge · 8 MW~3.9 mi
  3. Apollo Project - Helena Harbor Data CenterPhillips County · Campus · 1.0 GW5.0 mi
  4. Searcy Information TechnologiesSearcy County · Institutional6.5 mi
  5. Jones Digital Data Center (Jones Eagle LLC, DeWitt)Arkansas County · Small~10 mi

Distance is to the boundary of the nearest protected unit; open a facility to see which.

Share this page

Map of data centers in Arkansas

Map of the 33 data centers in Arkansas tracked by More Than Just Parks, updated October 2026
Every light is a facility we can tie to a public source, drawn October 2026. Map by More Than Just Parks, free to share and embed with the credit link.
DownloadShare cardSquareTall

Every tracked facility in Arkansas

33 facilities across 18 counties, the busiest first. Open a county to see its facilities; each one opens its own record.

Pulaski County 2 proposed 1 under construction 8 operating11
  1. AVAIO Digital LeoLarge · 150 MW
  2. Google Port of Little Rock Data CenterLarge · 100 MW
  3. Sweet Home Data Center (Google)Large · 100 MW
  4. Acxiom Data Center - Little RockSmall
  5. Arkansas State IT Data CenterInstitutional
  6. Dillard Department Stores ITSmall
  7. Lumen (tw telecom) Little Rock Data CenterNetwork
  8. Mainstream Technologies Little RockSmall
  9. Sollensys Little Rock Data CenterSmall
  10. TierPoint Little Rock ARColocation
  11. Windstream Little Rock ARSmall
Washington County 3 operating3
  1. Cox Edge Johnson, ARSmall
  2. Green House Data Fayetteville CampusEdge · 2 MW
  3. University of Arkansas HPC CenterInstitutional
Faulkner County 1 proposed 1 operating2
  1. Conway Data CenterUnsized
  2. NewRays One Bitcoin MineSmall
Phillips County 1 proposed 1 operating2
  1. Apollo Project - Helena Harbor Data CenterCampus · 1.0 GW
  2. BlockOps Helena-West Helena Bitcoin Mine (Dragon Woodland sawmill site)Edge · 8 MW
Pope County 1 proposed 1 under construction2
  1. BlockOps Moreland Bitcoin MineUnsized
  2. Moreland Holding CryptomineUnsized
Arkansas County 1 operating1
  1. Jones Digital Data Center (Jones Eagle LLC, DeWitt)Small
Benton County 1 operating1
  1. Walmart Bentonville ARSmall
Columbia County 1 operating1
  1. Wave Garden Macedonia CryptomineSmall
Craighead County 1 operating1
  1. Ritter Communications Data Technology Center JonesboroSmall
Crittenden County 1 under construction1
  1. Google, Crittenden County, ARCampus
Grant County 1 proposed1
  1. Grant County Data Center (Clean Cloud Energy / EdgeConneX, Sheridan)Campus · 800 MW
Johnson County 1 under construction1
  1. Serverfarm Clarksville CampusCampus
Lawrence County 1 operating1
  1. ImmersionBTC Walnut Ridge MineSmall
Lonoke County 1 operating1
  1. Interstate Holdings Blockchain Cabot MineSmall
Miller County 1 proposed1
  1. Bentaus AI Data Center - Miller CountyLarge · 200 MW
Mississippi County 1 operating1
  1. BTC Digital Manila Bitcoin Mining and Hosting Facility (BTC Digital Ltd.)Small
Searcy County 1 operating1
  1. Searcy Information TechnologiesInstitutional
Sharp County 1 under construction1
  1. Artemis Technologies Cave City Bitcoin Data CenterUnsized

Data centers in Arkansas: common questions

How many data centers are in Arkansas?
More Than Just Parks tracks 33 active data center facilities in Arkansas, each citing a public source: 21 operating, 5 under construction and 7 proposed. 6 more were canceled, withdrawn, suspended or blocked.
How much electricity do Arkansas's data centers use?
We don’t publish a state total, and the reason matters: about eight in ten facilities here never disclose a capacity, so any sum would look like a census of Arkansas's data center load while leaving out the sites that stayed quiet. Each facility page shows the figure its own source states. A single large campus can draw as much power as a small city.
Are Arkansas data centers near protected land?
5 of the tracked facilities in Arkansas sit within 10 miles of protected public land, measured to the real boundary of the nearest national park, wilderness area, wildlife refuge or conservation area; none sit within a single mile.
Which county in Arkansas has the most data centers?
Pulaski County has the most, with 11 tracked data centers, followed by Washington County (3) and Faulkner County (2).
Are there proposed data centers in Arkansas?
Yes. We track 7 proposed data centers in Arkansas, including Apollo Project - Helena Harbor Data Center, Grant County Data Center (Clean Cloud Energy / EdgeConneX, Sheridan) and Bentaus AI Data Center - Miller County. One of them sits within 10 miles of protected public land.
Who is building data centers in Arkansas?
The most active operators in Arkansas are Google (3 sites), BlockOps (2 sites) and Clean Cloud Energy (EdgeConneX identified as potential developer/buyer) (1 site), counted by sites, not megawatts.

Get alerts for Arkansas

An email when a data center lands in the record here, proposed, breaking ground or stopped, with its size and how close it sits to protected land.

Every facility on this page cites a public record we can link to: industry reporting, facility trackers, company announcements, and local planning and utility filings, cross-referenced against protected public land. Part of the Data Center Tracker from More Than Just Parks. A facility shows a capacity only where its own source states one.

Nearby states

  1. Data centers in Louisiana28
  2. Data centers in Missouri62
  3. Data centers in Mississippi35
  4. Data centers in Oklahoma46
  5. Data centers in Tennessee73
  6. Data centers in Texas464

Other states

About this data. Every entry links to the public source it’s based on. Those sources can be incomplete, provisional or out of date, and they aren’t official filings or interconnection records. Company and project attributions reflect third-party public reporting, not assertions of fact by More Than Just Parks, and nothing here is legal, financial or investment advice. Company and project names are trademarks of their respective owners, used for identification and commentary only. Found something wrong? Email ask@morethanjustparks.com and we’ll review and correct it. Night lights are NASA Black Marble, a 2016 composite, drawn for context. Data and legal notice.