Comments closed November 9
Stop Shell's four-well deepwater blowout plan in the Gulf
Bureau of Ocean Energy Management · federal offshore waters
- What
- The plan's own data show a 21% chance that a worst-case blowout releasing 28.3 million barrels would reach Louisiana's most ecologically critical coastline within 30 days.
- Where
- federal offshore waters
- How much
- Worst-case discharge rate, first day: 317,909 BOPD. Total worst-case spill volume until relief well: 28.3 MMBO. Probability of oil contacting Plaquemines Parish within 30 days: 21%.
- Decided
- Comments closed November 9, 2026. No decision document is on file yet.Date from regulations.gov ↗, read November 8, 2026.
Where these four lines come from
- WhatOur plain-English read of the Regulations.gov comment docket ↗. Check it against the agency’s own words under Case.
- WhereThe places and states the notice names, as PLAN read them.
- 317,909 BOPD“Uncontrolled blowout (volume first day) 317,909 BOPD oil” Table 1 Open the document ↗
- 28.3 MMBO“Total volume of spill (bbls) 28.3 MMBO” Table 3 Open the document ↗
- 21%“C20 Plaquemines, Louisiana 4 14 21” Table 3 Open the document ↗
- DecidedNovember 9, 2026, from regulations.gov, the comment period on the document ↗: “Comment period ends 2026-11-10T04:59:59Z (regulations.gov, commentEndDate)”. Read November 8, 2026. The decision document is the one on file in PLAN’s record.
- Read from PLAN’s record November 13, 2026.
What the proposal said, and what the decision did
No figure from the proposal has been checked against the decision on this fight yet. What the record does hold is the issues ledger below.
No decision document is on PLAN’s record for this fight yet. When the agency’s decision lands, what it answered goes here.
Affects public lands
The plan's own data show a 21% chance that a worst-case blowout releasing 28.3 million barrels would reach Louisiana's most ecologically critical coastline within 30 days.
What’s at risk
If this goes through
Our plain-English read of the official notice ↗. Check it against the agency’s own words below.
By the numbers, from the agency’s own document
- Worst-case discharge rate, first day
- Total worst-case spill volume until relief well
- Probability of oil contacting Plaquemines Parish within 30 days
- Proposed drilling days per year, 2027-2030
Section 1
Open the document ↗“the proposed work is estimated to take up to 30 days in 2026 and 135 days per year from 2027 to 2030”
- Rice's whale population estimate
C.3.2
Open the document ↗“The Rice's whale is the only year-round resident baleen whale in the northern Gulf of America with the population estimated to be fewer than 100 individuals”
- Estimated time to on-water spill response
Section 9
Open the document ↗“Shell can be onsite with dedicated, contracted on water oil spill recovery equipment with adequate response capacity to contain and recover surface oil, and prevent land impact, within approximately 101 hours”
Source: the agency’s document ↗
The agency’s own analysis
What the notice says, and what it leaves out
The window has closed; the record of what was missing stays.
The agency says
“Report prepared for LLOG Exploration Company, LLC, Project No. 11-013-01. Report submitted to BOEM by Kosmos Energy LLC along with EP Submission S-8134 (2024).”
The geohazard and archaeological surveys that the plan relies on were conducted in 2010 and 2011 for a different prior operator (LLOG/Kosmos), not for Shell's current proposed wells.
The agency says
“Shell requests that the Regional Supervisor, Field Operations, determine the zones in the proposed drilling operations in this plan to be classified as an area where the presence of H2S is unknown.”
The plan classifies MC 301 as H2S absent in Table 2 footnote (5) of the EIA, yet Section 4 of the plan itself states that H2S presence is unknown, that Shell is requesting the Regional Supervisor classify the zone as 'H2S unknown,' and that the P95 concentration is 73 ppm in gas at the surface.
The agency says
“The Rice's whale is the only year-round resident baleen whale in the northern Gulf of America with the population estimated to be fewer than 100 individuals.”
The EIA acknowledges that the Rice's whale, the only year-round resident baleen whale in the Gulf with a population estimated at fewer than 100 individuals and a PBR of 0.1, could be affected by vessel strikes and a large oil spill.
The agency says
“The content, and its toxicity, of each individual barrel is not known. However, there are records of a wide range of industrial waste materials that were disposed in the barrels including chlorinated hydrocarbons and liquid metal salts.”
Section 6 of the plan acknowledges the presence of hundreds of chemical waste barrels in the Mississippi Canyon area containing chlorinated hydrocarbons, liquid metal salts, and other industrial wastes of unknown toxicity.
The agency says
“Including contingency, the proposed work is estimated to take up to 30 days in 2026 and 135 days per year from 2027 to 2030.”
The plan proposes exploratory drilling at 135 days per year from 2027 through 2030, a four-year continuous program, yet the EIA characterizes impacts throughout as limited in geographic scope and short in duration.
The agency says
“Shell can be onsite with dedicated, contracted on water oil spill recovery equipment with adequate response capacity to contain and recover surface oil, and prevent land impact, within approximately 101 hours.”
The plan's oil spill response section states that Shell can be onsite with dedicated contracted on-water oil spill recovery equipment within approximately 101 hours of a worst-case discharge.
The agency says
“Shell's specific containment response for MC 301 will be addressed in Shell's NTL 2010-N10 submission at the time the APD is submitted.”
The EIA states that the containment response details for MC 301 will be addressed in Shell's NTL 2010-N10 submission at the time the Application for Permit to Drill is filed, not in this Exploration Plan.
In the agency’s own words
Other
Who signs it
The notice names no signer PLAN could read. PLAN names a decision-maker only when the document names one.
The ground
The window has closed, so there’s no watch to set on it here.
The photograph on this page: Open water on the Outer Continental Shelf off Virginia (BOEM photo). More Than Just Parks.
In court on this ground
This fight isn’t bound to a land unit in PLAN’s record yet, so there are no court cases to show for its ground.
Who holds the vote
PLAN’s record doesn’t tie a member of Congress to this fight yet. The scorecard grades the votes and bills that decide public lands; nothing joins a vote or a bill to this decision, so there’s no member to name here without guessing.
See how your members vote ↗Regulations.govWe track this on the agency’s own system of record, where most on-the-ground decisions live.
On the record for this fight
3 people told us they filed on this fight through PLAN; we haven’t found any of their letters on the agency’s record yet.
- Amy M.59 seals
- Judith A.79 seals
- and 1 more steward
Ranked on letters found on the agency’s record, then letters filed. Readers appear as first name and last initial, or as a steward in their state; switch yours off in your record. All boards
Know an open comment period we are missing, or spotted a wrong deadline? .
More fights that need you
Go deeper for free
See how your members of Congress vote on public lands
Every representative, graded on the votes that decide the fate of parks, forests, and refuges.
Open ↗The mapSee the places under active threat
A live map of the parks, monuments, and wild country in the crosshairs right now.
Open ↗A wrong fact, a dead link, a form that wouldn’t take your letter: one tap and it comes to the people who build PLAN, with this fight attached.