Nez Perce-Clearwater National Forests, IdahoMore Than Just Parks
What
The agency proposes 637 acres of regeneration harvest, 12 miles of temporary road, and one mile of permanent road in a steelhead-critical-habitat watershed while ESA Section 7 consultation with NMFS remains unfinished.
Where
Nez Perce-Clearwater National Forest, Palouse Ranger District, ID
By when
Comments to U.S. Forest Service by October 26, 2026.Date from Forest Service CARA comment page ↗, read October 15, 2026.

What to ask forAll 10 points →

The agency should provide a project-level analysis explaining exactly how each statutory criterion for emergency action is satisfied here, rather than relying on a blanket landscape-level designation to eliminate the public's right to administrative review.

Where these four lines come from
  • WhatOur plain-English read of the U.S. Forest Service project page ↗. Check it against the agency’s own words under Case.
  • WhereThe places and states the notice names, as PLAN read them.
  • 637 acres“637 acres of regeneration harvest, 52 acres of commercial thinning (intermediate harvest), and 2,208 acres of non-commercial thinning” Forest Vegetation Open the document ↗
  • approximately 12 miles“Approximately 12 miles of temporary road with 8 stream crossings will be constructed to facilitate timber harvest” Water and Aquatic Ecosystems (including Riparian Management Zones) Open the document ↗
  • 20 miles“The proposed action to expand the Feather Creek non-motorized trail system will add an additional twenty (20) miles of non-motorized trail.” Sustainable Recreation (including Recreation A&R) Open the document ↗
  • By whenOctober 26, 2026, from Forest Service CARA comment page, the notice text ↗: “requested through 10/26/2026 11:59:59 PM (Pacific Standard Time)”. Read October 15, 2026.
  • Read from PLAN’s record October 15, 2026.
Now make it count11 days left

Two ways to be heard on this, and both count. Comment for the legal record, then call the members who answer to you.

Comment now

10 holes in the agency’s own analysis

Make these points, in your own words

  • The agency invoked a Secretarial Emergency Situation Determination to strip this project of pre-decisional administrative review under 36 CFR part 218, yet the document never demonstrates that the Feather Creek project independently meets the statutory criteria for emergency designation under IIJA Section 40807.Read the point +

    The document states only that the project area 'falls within the landscape identified by Secretary Rollins' and that use of the authority is 'appropriate.' That circular reasoning is not a site-specific legal finding. The agency should provide a project-level analysis explaining exactly how each statutory criterion for emergency action is satisfied here, rather than relying on a blanket landscape-level designation to eliminate the public's right to administrative review.

  • The Section 7 ESA consultation for Snake River Basin Steelhead is listed as 'ongoing' at the time this document was published, yet the agency describes in detail the proposed in-water construction, culvert work, and fish-salvage activities that are already designed and presented as the proposed action.Read the point +

    A LAA determination for a federally threatened species requires a completed Biological Opinion before the agency can proceed. The document does not explain how it will incorporate the outcome of an unfinished consultation into this decision. The agency should complete consultation and receive a Biological Opinion before finalizing the EA and FONSI.

  • The document acknowledges that the Potlatch River temperature TMDL establishes load allocations based on effective shade, and that relocating FSR 377 will require clearing riparian vegetation including live overstory within the inner RMZ at up to 10 new stream crossings.Read the point +

    The document then explicitly states that 'the current project record does not quantify the final inner-RMZ clearing footprint' and that restoration benefits from the old road removal 'do not substitute for evaluating the effects of new-road clearing in relation to applicable temperature TMDL allocations and FW-STD-WTR-06.' The agency has identified a gap in its own analysis but has not filled it. The agency should quantify the RMZ clearing footprint at each new crossing and demonstrate compliance with the Potlatch River temperature TMDL before issuing a FONSI.

  • The document states that vegetation treatments will raise equivalent clearcut area (ECA) from 2 percent to 9.7 percent on Forest Service lands, just below the 10 percent LMP screening threshold for low potential to alter peak and low flows.Read the point +

    However, the scope of analysis for forestlands explicitly excluded a geographically disconnected 4,600-acre 'tail' of Forest Service acreage within the same HUC12 subwatershed. If that acreage and any existing ECA within it were included in the denominator, the resulting ECA percentage could be different. The agency should recalculate ECA using the full HUC12 Forest Service land base or explain in quantitative terms why excluding the 4,600-acre tail does not affect the threshold finding.

  • The document dismisses forestland, wildlife, soils, fire management, and recreation from detailed analysis by relying on the LMP FEIS as already-analyzed programmatic coverage.Read the point +

    At the same time, it acknowledges site-specific conditions that the LMP FEIS does not address: the document states explicitly that 'The LMP and LMP FEIS does not address this, because it is a highly specific area of concern with the continued flooding over and into the current FSR 377.' If the LMP FEIS did not address the most distinctive site condition driving this project, the agency cannot credibly claim that the same FEIS provides adequate detailed analysis for effects flowing from that condition. The agency should conduct project-level detailed analysis of effects on forestland and soils that are tied to the specific meadow-flooding hydrology not covered by the programmatic FEIS.

Say something only you can say. The law requires the agency to consider and respond to substantive comments, and specifics are what make a comment substantive.

Every point is checked against the agency’s own document ↗. 10 findings verified against the text, word for word.