PART I · WHAT IS PROPOSED CHAPTER 2 The inventory

A Road Is Not a Line What the Ambler Road project builds

The Ambler Road is drawn as a thin stroke across a map. What's actually proposed is 41 gravel mines, 137 acres of spur roads, three airstrips, five camps, four maintenance stations, twelve communications towers and 2,932 water crossings. The road itself is only about half of the ground it takes.

REPORTING BY MORE THAN JUST PARKS
SOURCE: 2024 RECORD OF DECISION, COMPONENT TABLE, AND AIDEA'S OWN ENGINEERING GIS
EVERY COMPONENT BELOW IS DRAWN ON THE ATLAS AND CAN BE CLICKED

What this chapter finds

  1. The 211-mile road itself is only about half of the ground the project takes, 2,318 acres. The full footprint is 4,524 acres, and 332 of those acres are inside a national park unit.
  2. It needs 15 million cubic yards of gravel to build and 220,000 more every single year to maintain, which is why it needs 41 gravel mines of its own.
  3. Everything in the inventory is permanent infrastructure in country that has none: airstrips, camps, maintenance stations, communications towers, and 137 acres of spur roads branching off the first one.
  4. Where the government's count and the applicant's engineering file disagree, they disagree by small numbers and in the same direction. We print both.

The inventory, in full

This is the Bureau of Land Management's own component table for the chosen route, set against what AIDEA's engineering GIS actually draws. Nothing here's our estimate. The left column is the decision document, the right is the applicant's file, and where they differ the difference is the story.

ComponentRecord of Decision, Alternative AAIDEA's engineering file
Material sites, the gravel mines41, over 1,863 acres44 polygons, 32 carrying its own asbestos rating; one inside the preserve, where the signed park permit allows none
Support access and spur roads137 acres of footprint137 drawn segments: 53 permanent, 84 temporary
Airstrips, 150 feet by 3,000 feet3, over 153 acres3 permanent, plus 3 construction airstrips
Maintenance stations, 12 acres each4, over 48 acres5
Construction campsCamps every 40 to 45 miles, about 5 acres each (2024 Final SEIS, p. 49)5
Vehicle turnouts20, one every 10 to 11 miles21
Communications towers12: three at maintenance stations, nine at material sites12, at landing strips, camps and material sites
Culverts2,864 minor, 7 moderate, 12 majorDrawn individually
Bridges22 small, 16 medium, 11 large32 bridge footprints
Total water crossings2,9322,932, counted off the centerline ourselves
Total project footprint4,524 acres
Footprint inside Gates of the Arctic332 acres
Gravel to build15 million cubic yards
Gravel to maintain, every year220,000 cubic yards

2024 Record of Decision, page 12, component comparison table, sourced there to DOWL 2016, the US Army Corps of Engineers 2020, and BLM analysis. Engineering file counts are from AIDEA's published GIS, recounted against the files on September 11, 2026.

Two different 137s, and they aren't the same number

The Record of Decision reports 137 acres of support access road footprint. AIDEA's GIS draws 137 access-road segments, 53 permanent and 84 temporary, a few of them only slivers. It's a coincidence. One is an area and one is a count, they aren't convertible into each other, and no sentence on this site may imply they're.

What one of these looks like on the ground

Numbers in a table are easy to skim past. Here's a clearing in this country, photographed from the air in August, and the same forest a few frames later on the same flight, with nothing in it.

Aerial looking down on a cleared industrial pad with equipment and fuel drums cut into open spruce forest
A clearingGround stripped to bare dirt, a drill rig, fuel drums and a shed, cut into open spruce. Photographed from the air, August 2026. More Than Just Parks.
Aerial looking down on open spruce forest with no clearing or track in it
The same countryThe same forest, a few frames later on the same flight and at the same altitude, with no cut, no pad and no track in it. More Than Just Parks.

The project proposes 41 gravel mines over 1,863 acres. That is a clearing roughly every five miles for 211 miles, each one a separate excavation with its own access road running off the corridor to reach it. In the 2020 Army Corps permit action, AIDEA's own design changes cut the material sites it requested from 41 to 15 and took every one of them out of the park unit, with any more to be requested in a separate permit. AIDEA's engineering file still draws one inside the preserve, GANPP Outwash, 47 acres. The right-of-way permit the Park Service signed on October 21, 2025 allows none: it “does not include authorization for any material sites, construction camps, maintenance facilities or airstrips; any such facilities are prohibited.”

National Park Service right-of-way permit RW GAAR-25-001, page 4, executed October 21, 2025; its Exhibit B-2 maps draw no material site inside the preserve. Read October 15, 2026. The site's location and acreage: AIDEA engineering GIS, material sites layer, against the National Park Service boundary.

A cleared gravel pad cut into spruce forest along the Dalton corridor, from the air
A material siteA gravel pad cut into spruce along the Dalton corridor, from the air, August 2026. The Ambler Road's engineering file draws 44 of these. More Than Just Parks.
A gravel spur road running straight through spruce forest, from the air
A spurA gravel spur road through spruce along the Dalton corridor, August 2026. The Ambler Road's file draws 137. More Than Just Parks.

The gravel never stops

A gravel road on thawing ground isn't a thing you build once. The decision document states both numbers plainly: 15 million cubic yards to construct, and 220,000 cubic yards every year to maintain.

220,000 yd³ Gravel needed every year, for as long as the road exists. The right-of-way grant runs 50 years.

Multiplying those two figures together is our arithmetic and not the government's, so we label it and let the reader do what they like with it: at 220,000 cubic yards a year across the 50-year term of the grant, maintenance alone calls for about 11 million more cubic yards, on top of the 15 million it takes to build. That gravel comes out of the same pits, in the same country, for the life of the road.

And it's worth being precise about why the embankment is so hungry. It's 3 to 8 feet thick because the ground underneath is frozen, and where the ground is worst it gets thicker still. The ground chapter follows that chain all the way down.

A cleared industrial pad on lowland flats with ponds beyond, from the air
A pad on the flatsA cleared pad on lowland flats along the Dalton corridor, ponds beyond, August 2026. Camps, maintenance stations and airstrips are pads like this one. More Than Just Parks.

Infrastructure in country that has none

The components that get least attention are the ones that turn a road into a system. Twelve communications facilities. Three airstrips at 150 feet by 3,000 feet, plus three more for construction. Five camps. Four maintenance stations at twelve acres each, permanent, staffed, kept for the life of the road.

A communications tower with microwave dishes, a small building and equipment on open tundra, seen from the air
A communications tower with its dishes, its building and its gear on open tundra in the Brooks Range, photographed from the air in August 2026. The project proposes twelve of these. More Than Just Parks.

None of this is hidden. All of it's in the application, the environmental review and the decision. It's simply never the thing that gets drawn on a map, and a single line across an empty map is a misleading picture of what's being decided.

Where it crosses water

The largest number in the inventory is the one nobody quotes: 2,932 water crossings. 2,864 minor culverts, 7 moderate and 12 major, plus 22 small bridges, 16 medium and 11 large.

We didn't take that number from a press release. We counted every crossing off AIDEA's own engineering centerline, and each one is on the atlas with its structure class, its landowner, its watershed and its corridor mile. The water chapter takes them apart; the atlas lets you check our count against the government's.

Structure counts: 2024 Record of Decision, page 12. Crossing geometry and attributes: AIDEA engineering GIS, counted by More Than Just Parks. Our 2,932 matches the federal total: the 2020 Joint Record of Decision says "approximately 2,932 streams would be crossed," and the 2024 table's crossing rows sum to it.

What this chapter doesn't say

It doesn't say the applicant hid any of this. Every component here comes from documents AIDEA filed or the government published. The public conversation has been about a line on a map, and the decision was about an industrial complex.

It doesn't treat the two counts as an accusation. Where the ROD counts 41 pits and the file draws 44, or 4 maintenance stations against 5, the likeliest explanations are mundane: multipart geometry, features belonging to another alternative, or shared facilities at the Dalton end. We print both numbers and don't resolve what we can't.

It doesn't claim the photographs show Ambler infrastructure. No part of the Ambler Road exists. The clearing and the tower on this page are in this country, photographed in August 2026, and they show what this kind of facility looks like here. Nothing more is claimed for them.

Questions readers ask

What does the Ambler Road project actually include?

Beyond the 211-mile road itself: 41 gravel mines, 137 acres of spur roads, three airstrips, five camps, four maintenance stations, twelve communications towers and 2,932 water crossings. All of it is permanent infrastructure in country that has none.

2024 Record of Decision; AIDEA engineering GIS. Both counts are printed on this page.
How much land does the Ambler Road take?

The full footprint is 4,524 acres, and 332 of those acres are inside a national park unit. The road itself is 2,318 of those acres, about half. The rest is gravel mines, spur roads, airstrips, camps and stations.

2024 Record of Decision; AIDEA engineering GIS. Both counts are printed on this page.
How much gravel does the Ambler Road need?

Fifteen million cubic yards to build, and 220,000 more every year to maintain, which is why the project needs 41 gravel mines of its own along the route. The Ground covers what the applicant's own file says is in some of those pits.

2024 Record of Decision; AIDEA engineering GIS. Both counts are printed on this page.

What to do with this

Everything on this page is mapped, and the map is open. If you want to see where the pits are, which ones AIDEA rated for asbestos, where the towers and camps and turnouts sit, and which of the 2,932 crossings fall on National Park Service land, the atlas answers all of it and it's free.

If you write about this project, the single most useful correction you can make is to stop calling it a road. It's a road plus 41 gravel mines plus 137 acres of spur roads plus the rest of this table.