- Capacity
- 14 MWreported
- To protected land
- 61mifrom Cross Timbers Research Natural Area
- Capacity14 MWreported: “A total of 13.5 MW of three-phase power is fed to the data center and is scalable to a 26 MW capacity.”
- FootprintMid-size
The source
“A total of 13.5 MW of three-phase power is fed to the data center and is scalable to a 26 MW capacity.”Cloud and Colocation
Source-checked, read back against the document on Sep 10, 2026.
What’s happened here
Nothing dated on this site yet beyond its listing. A hearing, a filing, a vote, a photograph from the road: if you know of one, it belongs here.
Add to the record
What you post goes on this page the moment its source checks, labeled as a reader’s report. We don’t edit it and we don’t take sides on it.
Something on this page wrong?
Tell us what’s wrong and where you saw it. We check it in the public record, and a listing that changes says so on this page.
Also in Dallas County
- Yondr Group Dallas CampusYondr Group · Dallas County
- Project Orange and Project Labrador Data Center Campus (WHL Dallas 45 / Prime45, Lancaster)WHL Dallas 45 LLC (Prime45 Development) · Dallas County
- Crow Holdings 245MW Flagship Data Center Campus (Stemmons Corridor)Crow Holdings · Dallas County
- Stack Infrastructure Dallas SouthStack Infrastructure · Dallas County
- PowerHouse IrvingPowerHouse Data Centers · Dallas County
- QTS Irving - Dallas Data Center CampusQuality Technology Services · Dallas County