Back to the mapSee this site on the map/All of Texas
SOURCE
SOURCE Mission Critical Facility Dallas
Dallas County, Texas
Operating
61mifrom the boundary ofCross Timbers Research Natural Area
- Capacity14 MWreported: “A total of 13.5 MW of three-phase power is fed to the data center and is scalable to a 26 MW capacity.”
- FootprintMid-size
The source
“A total of 13.5 MW of three-phase power is fed to the data center and is scalable to a 26 MW capacity.”Cloud and Colocation
Source-checked, read back against the document on Sep 10, 2026.
What’s happened here
Nothing dated on this site yet beyond its listing. A hearing, a filing, a vote, a photograph from the road: if you know of one, it belongs here.
Add to the record
What you post goes on this page the moment its source checks, labeled as a reader’s report. We don’t edit it and we don’t take sides on it.
Something on this page wrong? Send a correction.
Also in Dallas County
- Yondr Group Dallas CampusYondr Group · Dallas County
- Project Orange and Project Labrador Data Center Campus (WHL Dallas 45 / Prime45, Lancaster)WHL Dallas 45 LLC (Prime45 Development) · Dallas County
- Crow Holdings 245MW Flagship Data Center Campus (Stemmons Corridor)Crow Holdings · Dallas County
- Stack Infrastructure Dallas SouthStack Infrastructure · Dallas County
- PowerHouse IrvingPowerHouse Data Centers · Dallas County
- QTS Irving - Dallas Data Center CampusQuality Technology Services · Dallas County