Crow Holdings
Crow Holdings 245MW Flagship Data Center Campus (Stemmons Corridor)
Dallas County, Texas
Proposed
~51mifrom the boundary ofCross Timbers Research Natural Area · location held to about a kilometer, so the distance is approximate
- Capacity245 MWannounced: “The full campus is planned for up to 245MW supported by a dedicated, on-site substation.”
- FootprintLarge, capacity not disclosed
- Grid regionERCOT
The source
“The full campus is planned for up to 245MW supported by a dedicated, on-site substation.”Crow Holdings
Source on file. The name, operator and capacity haven’t yet been read back against the source.
What’s happened here
Nothing dated on this site yet beyond its listing. A hearing, a filing, a vote, a photograph from the road: if you know of one, it belongs here.
Add to the record
What you post goes on this page the moment its source checks, labeled as a reader’s report. We don’t edit it and we don’t take sides on it.
Something on this page wrong? Send a correction.
Also in Dallas County
- Yondr Group Dallas CampusYondr Group · Dallas County
- Project Orange and Project Labrador Data Center Campus (WHL Dallas 45 / Prime45, Lancaster)WHL Dallas 45 LLC (Prime45 Development) · Dallas County
- Stack Infrastructure Dallas SouthStack Infrastructure · Dallas County
- PowerHouse IrvingPowerHouse Data Centers · Dallas County
- QTS Irving - Dallas Data Center CampusQuality Technology Services · Dallas County
- QTS Dallas-Irving Mega CampusQTS Realty · Dallas County