Back to the mapSee this site on the map/All of Texas
Edged Energy
Edged Dallas Data Center (Irving, DFW01-1)
Dallas County, Texas
Operating
- Capacity
- 24 MWreported
- To protected land
- ~52miabout, from Cross Timbers Research Natural Area
- Capacity24 MWreported
- FootprintMid-size
The source
Edged Energy (company release)Source on file. The name, operator and capacity haven’t yet been read back against the source.
What’s happened here
Nothing dated on this site yet beyond its listing. A hearing, a filing, a vote, a photograph from the road: if you know of one, it belongs here.
Add to the record
What you post goes on this page the moment its source checks, labeled as a reader’s report. We don’t edit it and we don’t take sides on it.
Something on this page wrong?
Tell us what’s wrong and where you saw it. We check it against the record, and a listing that changes says so on this page.
Also in Dallas County
- Yondr Group Dallas CampusYondr Group · Dallas County
- Project Orange and Project Labrador Data Center Campus (WHL Dallas 45 / Prime45, Lancaster)WHL Dallas 45 LLC (Prime45 Development) · Dallas County
- Crow Holdings 245MW Flagship Data Center Campus (Stemmons Corridor)Crow Holdings · Dallas County
- Stack Infrastructure Dallas SouthStack Infrastructure · Dallas County
- PowerHouse IrvingPowerHouse Data Centers · Dallas County
- QTS Irving - Dallas Data Center CampusQuality Technology Services · Dallas County
More from Edged Energy
- Pottawattamie County Cloud CenterEdged Energy · Pottawattamie County
- Edged Atlanta Campus (ATL01-ATL03)Edged Energy · Fulton County
- Edged Energy Kansas City (MCI01-1)Edged Energy · Clay County
- Edged Energy Columbus (CMH01)Edged Energy · Franklin County
- Edged Energy Des Moines/Ankeny Data CenterEdged Energy · Polk County
- Edged Energy Las Vegas LAS01Edged Energy · Clark County