Cimarron National Grassland
The agency files it as “Public Service Company of Colorado (Xcel Energy) 9254/9257 and 9255 Transmission Line Rebuild”
The agency stopped taking comments on September 28. What you find still counts: it backs the formal objections from people who did comment, it goes to the lawyers on the fight, and it is the story.
“The long term addition of approximately 13 miles of permitted roads for intermittent maintenance patrol use represents a long term increase in erosion potential.”
The agency wrote that in its own document, under Water Resources. Nobody has been out to check it. A dated photograph either backs it up or ends it.
Walk to where the power line crosses public land near Leadville and Buena Vista and photograph the ground under and beside the poles: is there already a two-track, or is it untouched slope and meadow? Photos at pole locations showing either an existing drivable track or undisturbed ground where a maintenance road would have to be cut.
Xcel Energy proposes to replace wood poles with steel monopoles, H-frame, and three-pole dead-end structures on its 115kV transmission line circuits where they cross Forest Service and BLM lands near Leadville and Buena Vista. The project would also add administrative use access routes and adjust the right-of-way width, while keeping the existing voltage rating the same. A draft Decision and Findi
Read the whole thing, and write to the agency about itSay yes or no. It tells the next person whether anyone has this ground covered, and it is the only way we know a request was answered rather than just read. You can change your mind any time, and nobody follows up.
Nobody has answered yet