Comments closed October 26 · decided
Demand Site-Specific Analysis Before Approving Little Giant Post-Fire Salvage
U.S. Forest Service · Okanogan-Wenatchee National Forest, WA
- What
- The agency has approved undisclosed post-fire salvage activities starting November 13, 2026, based entirely on a national-scale programmatic EA rather than any site-specific analysis of the Little Giant fire area.
- Where
- Okanogan-Wenatchee National Forest, WA
- How much
- Minimum snow depth required before any ground operations begin: ≥8 inches of compacted snow or frozen ground. Earliest date agency intends to begin implementation: no sooner than November 13, 2026.
- Decided
- Comments closed October 26, 2026. The decision is on file: 20261118_LittleGiantPhase1_FONSI_Final. Open it ↗Date from Forest Service CARA comment page ↗, read October 29, 2026.
Where these four lines come from
- WhatOur plain-English read of the Forest Service project page ↗. Check it against the agency’s own words under Case.
- WhereThe places and states the project page names, as PLAN read them.
- ≥8 inches of compacted snow or frozen ground“All ground-based operations occur during winter on ≥8 inches of compacted snow or frozen ground.” Determination of No Significant Impacts Open the document ↗
- no sooner than November 13, 2026“I intend to implement the approved activities no sooner than November 13, 2026.” Anticipated Implementation of Authorized Activities Open the document ↗
- DecidedOctober 26, 2026, from Forest Service CARA comment page, the notice text ↗: “requested through 10/26/2026 11:59:59 PM (Pacific Standard Time)”. Read October 29, 2026. The decision document is the one on file in PLAN’s record.
- Read from PLAN’s record November 29, 2026.
What the proposal said, and what the decision did
PLAN has read 5 figures from the proposal and the decision here, and a person hasn't checked them yet. They go here once someone has.
Did the agency answer?
PLAN found 10 issues in the agency’s analysis.
Each issue against the decision not yet reviewed
PLAN’s match, not yet checked by a personThe FONSI approves post-fire salvage logging and hazard tree removal on the Okanagan-Wenatchee National Forest by relying entirely on a generic national-level programmatic EA rather than conducting any site-specific NEPA analysis.
The FONSI approves post-fire salvage logging and hazard tree removal on the Okanagan-Wenatchee National Forest by relying entirely on a generic national-level programmatic EA rather than conducting any site-specific NEPA analysis.
The section 'Documentation Informing the FONSI' says the decision relies on and incorporates by reference the PFREA, a document hosted at a national disaster-recovery webpage. The irreversible-commitment rationale then confirms the analysis was performed at the 'national scale,' not the site scale. NEPA requires analysis of the specific proposed action in its actual environment, not application of a national template by reference. The agency should prepare a site-specific Environmental Assessment or Environmental Impact Statement for the Little Giant fire area, or provide a detailed demonstration with site-specific data showing how the PFREA's national-scale assumptions apply to the conditions of the 2026 Little Giant fire perimeter.
A hole PLAN found in the agency’s own analysis
“The Little Giant Post-Fire Recovery – Phase 1 Determination Analysis Reliance (DAR) provides additional details on how the PFREA supports this FONSI. Other supporting documentation includes the Little Giant – Phase 1 Biological Evaluation Checklist, preliminary Biological Assessment, and Forest Plan Compliance.”
The agency’s own words, 20261118_LittleGiantPhase1_FONSI_Final ↗, Documentation Informing the FONSI · PLAN’s match, unchecked, an answer in part
PLAN’s match, not yet checked by a personUnder 'Activities Approved,' the FONSI approves post-fire recovery activities without disclosing a single project-scale quantity: no acreage to be treated, no board feet to be harvested, no miles of road to be maintained, no hazard-tree count, no species inventory.
Under 'Activities Approved,' the FONSI approves post-fire recovery activities without disclosing a single project-scale quantity: no acreage to be treated, no board feet to be harvested, no miles of road to be maintained, no hazard-tree count, no species inventory.
The entire project scope is deferred to an external Determination Analysis Reliance (DAR) document not reproduced in the FONSI. A member of the public cannot make an informed or meaningful comment on an approval that describes its scope only as activities described in an external document. The agency should disclose all project quantities in the FONSI itself and extend the comment period to allow meaningful public review once that information is available.
A hole PLAN found in the agency’s own analysis
“eliminating more than 1,500 acres of potential area timber harvest; reducing the maximum slope eligible for harvest activities from 45 percent to 40 percent; and establishing a maximum contiguous area harvest patch size of 40 acres.”
The agency’s own words, 20261118_LittleGiantPhase1_FONSI_Final ↗, Notable Changes · PLAN’s match, unchecked, an answer in part
PLAN’s match, not yet checked by a personThe irreversible-commitment rationale explicitly states the analysis was done at 'the national scale,' not at the Little Giant site.
The irreversible-commitment rationale explicitly states the analysis was done at 'the national scale,' not at the Little Giant site.
This admission confirms no site-specific review of the 2026 Little Giant fire perimeter has been performed. Local conditions such as slope, soil type, hydrology, snag density, proximity to drinking water sources, and species composition may differ materially from national-scale assumptions built into the PFREA. The agency should analyze site-specific conditions and explain with data how the PFREA's national-scale conclusions apply to the particular landscape of the Little Giant fire area.
A hole PLAN found in the agency’s own analysis
“Based on the analysis documented in the Little Giant Phase 1 DAR and the PFREA, I determined that the implementation of the proposed action would not result in irreversible or irretrievable commitments of resources that diminish the long-term productivity of the human environment.”
The agency’s own words, 20261118_LittleGiantPhase1_FONSI_Final ↗, Determination of No Significant Impacts · PLAN’s match, unchecked, an answer in part
PLAN’s match, not yet checked by a personThe FONSI concludes that no-action consequences outweigh the short-term impacts of Phase 1, but cites no site-specific data to support this comparison.
The FONSI concludes that no-action consequences outweigh the short-term impacts of Phase 1, but cites no site-specific data to support this comparison.
No hazard-tree inventory, no fuel-load measurements, no reburn probability model, and no site-specific insect or disease susceptibility analysis are provided for the Little Giant fire perimeter. The no-action analysis is a list of generic post-fire harms stated as assertions with no quantification or citation to site conditions. A reasoned NEPA decision requires grounding in actual data about the specific site. The agency should provide site-specific inventories and studies supporting its no-action consequence claims before finalizing this decision.
A hole PLAN found in the agency’s own analysis
“Based on the analysis documented in the PFREA and my review of current conditions and management needs within the Little Giant fire area, I have determined that the environmental effects of the proposed action are not significant”
The agency’s own words, 20261118_LittleGiantPhase1_FONSI_Final ↗, Determination of No Significant Impacts · PLAN’s match, unchecked, an answer in part
PLAN’s match, not yet checked by a personThe FONSI contains no mention of tribal consultation, no reference to Section 106 of the National Historic Preservation Act, no disclosure of cultural resource survey results, and no identification of Tribal governments whose ancestral or treaty lands may fall within the 2026 Little Giant fire perimeter.
The FONSI contains no mention of tribal consultation, no reference to Section 106 of the National Historic Preservation Act, no disclosure of cultural resource survey results, and no identification of Tribal governments whose ancestral or treaty lands may fall within the 2026 Little Giant fire perimeter.
The entire cultural-resource analysis rests on the claim that winter snow prevents soil contact. Winter operations and snow cover are not substitutes for the government-to-government consultation and pre-disturbance cultural surveys legally required before ground-disturbing activities begin. The agency should disclose the Section 106 consultation record, any site-specific cultural surveys conducted, and any tribal government consultation undertaken for this project area.
A hole PLAN found in the agency’s own analysis
“Project Design Criteria incorporated from the PFREA, together with additional Little Giant Phase 1 design criteria (DAR Appendix B, Tables B1 and B2), require winter-only operations, protection of riparian and aquatic resources, retention of wildlife habitat, biological legacies and coarse woody debris, avoidance of sensitive plant habitats, and protection of cultural resources.”
The agency’s own words, 20261118_LittleGiantPhase1_FONSI_Final ↗, Determination of No Significant Impacts · PLAN’s match, unchecked, an answer in part
PLAN’s match, not yet checked by a personThe FONSI dismisses the ecological value of post-fire snags and dead wood by characterizing all harvested trees as already dead or dying and therefore representing no net ecological loss.
The FONSI dismisses the ecological value of post-fire snags and dead wood by characterizing all harvested trees as already dead or dying and therefore representing no net ecological loss.
The document provides no snag density analysis, no cavity-nesting or snag-dependent species survey, and no assessment of which specific trees provide structural habitat versus genuine hazard near infrastructure and recreation sites. The 'already dead' reasoning treats all fire-killed trees as liabilities rather than analyzing their varied ecological roles. The agency should separately analyze hazard trees adjacent to roads and structures versus salvage logging in the fire interior, and provide species-specific analysis of snag-dependent wildlife before approving salvage beyond the hazard zone.
A hole PLAN found in the agency’s own analysis
“Additional refinements strengthen retention of post-fire biological legacies by increasing snag retention objectives to approximately 2 to 15 snags per acre (80 to 600 snags per 40 acres), representing up to a 650 percent increase above Northwest Forest Plan retention requirements of two snags per acre.”
The agency’s own words, 20261118_LittleGiantPhase1_FONSI_Final ↗, Notable Changes · PLAN’s match, unchecked
PLAN’s match, not yet checked by a personThe document is titled 'DRAFT' throughout and the signature block retains template placeholder instructions rather than a valid signature or date, yet 'Anticipated Implementation of Authorized Activities' announces that approved activities will begin no sooner than November 13, 2026.
The document is titled 'DRAFT' throughout and the signature block retains template placeholder instructions rather than a valid signature or date, yet 'Anticipated Implementation of Authorized Activities' announces that approved activities will begin no sooner than November 13, 2026.
A FONSI lacking a valid signature and date is not a final agency action under NEPA. Setting a firm implementation timeline in an unsigned, undated draft creates operational pressure before the document has legal standing. The agency should not announce or pursue any implementation timeline until the FONSI is properly signed and dated by the responsible official, and the public should have an opportunity to comment on the final signed version.
A hole PLAN found in the agency’s own analysis
“Implementation may begin immediately upon signing of this FONSI. Signature and Authorization Date Tara Umphries Okanagan-Wenatchee National Forest Forest Supervisor”
The agency’s own words, 20261118_LittleGiantPhase1_FONSI_Final ↗, Anticipated Implementation of Authorized Activities · PLAN’s match, unchecked
PLAN’s match, not yet checked by a personThe only quantified soil-protection standard in the FONSI is the requirement that ground-based operations occur on at least 8 inches of compacted snow or frozen ground.
The only quantified soil-protection standard in the FONSI is the requirement that ground-based operations occur on at least 8 inches of compacted snow or frozen ground.
The document names no inspection protocol, no monitoring party, no mechanism to verify snow depth before or during operations, no threshold for halting work if conditions change mid-operation, and no consequence for non-compliance. A protection standard that no identified party is required to verify and that carries no enforcement mechanism is not a design criterion; it is an untested assumption. The agency should provide a monitoring plan identifying who verifies snow depth prior to and during operations, at what frequency, and what shutdown procedure applies if conditions fall short of the standard.
A hole PLAN found in the agency’s own analysis
“Project Design Criteria incorporated from the PFREA, together with additional Little Giant Phase 1 design criteria (DAR Appendix B, Tables B1 and B2), require winter-only operations, protection of riparian and aquatic resources, retention of wildlife habitat, biological legacies and coarse woody debris, avoidance of sensitive plant habitats, and protection of cultural resources.”
The agency’s own words, 20261118_LittleGiantPhase1_FONSI_Final ↗, Determination of No Significant Impacts · PLAN’s match, unchecked, an answer in part
PLAN’s match, not yet checked by a personThe FONSI repeatedly asserts that design criteria ensure protection of resources across all resource areas but identifies no site-specific monitoring requirement, no compliance-verification protocol, no inspection frequency, and no party responsible for checking that design criteria are followed during operations.
The FONSI repeatedly asserts that design criteria ensure protection of resources across all resource areas but identifies no site-specific monitoring requirement, no compliance-verification protocol, no inspection frequency, and no party responsible for checking that design criteria are followed during operations.
Asserting that design criteria ensure protection without specifying how compliance is verified is not analysis; it is assumption. If design criteria are violated during operations and no monitoring program detects the violation, there is no enforceable NEPA record. The agency should prepare a site-specific implementation monitoring plan identifying responsible inspectors, inspection frequencies, and reporting requirements before authorizing any ground-disturbing operations.
A hole PLAN found in the agency’s own analysis
“These requirements ensure that the productive capacity of these resources is maintained and that no permanent degradation of soil, water, habitat, or cultural values is expected.”
The agency’s own words, 20261118_LittleGiantPhase1_FONSI_Final ↗, Determination of No Significant Impacts · PLAN’s match, unchecked, an answer in part
PLAN found no answer, not yet checked by a personThe FONSI dismisses cumulative effects by stating that project effects fall well within the PFREA's analyzed scope, without analyzing how Phase 1 activities combine with other ongoing post-fire recovery actions, road traffic increases, adjacent salvage operations, or prior disturbance history specific to the Little Giant fire perimeter.
The FONSI dismisses cumulative effects by stating that project effects fall well within the PFREA's analyzed scope, without analyzing how Phase 1 activities combine with other ongoing post-fire recovery actions, road traffic increases, adjacent salvage operations, or prior disturbance history specific to the Little Giant fire perimeter.
Claiming site-specific effects fall within a national programmatic scope is not a cumulative-effects analysis under NEPA. NEPA requires a reasoned examination of how the proposed action's effects add to the effects of past, present, and reasonably foreseeable future actions in the same geographic area. The agency should provide a site-specific cumulative-effects analysis for the Little Giant fire perimeter before issuing a final FONSI.
A hole PLAN found in the agency’s own analysis
PLAN's read: high threat
The agency has approved undisclosed post-fire salvage activities starting November 13, 2026, based entirely on a national-scale programmatic EA rather than any site-specific analysis of the Little Giant fire area.
What’s at risk
If this goes through
Our plain-English read of the official notice ↗. Check it against the agency’s own words below.
By the numbers, from the agency’s own document
- Minimum snow depth required before any ground operations begin
Determination of No Significant Impacts
Open the document ↗“All ground-based operations occur during winter on ≥8 inches of compacted snow or frozen ground.”
- Earliest date agency intends to begin implementation
Anticipated Implementation of Authorized Activities
Open the document ↗“I intend to implement the approved activities no sooner than November 13, 2026.”
Source: the agency’s document ↗
Testing the agency’s case
What the agency argues, and whether its own record backs it
- 2
- Not backed yet
The Okanogan-Wenatchee National Forest proposes hazardous fuels reduction, timber recovery and road work in the 2026 Little Giant Fire area. It says this work would support post-fire recovery, improve safety and restore forest conditions.
“The Okanagan-Wenatchee National Forest is proposing hazardous fuels reduction, timber recovery, and essential road work to support post‑fire recovery in the 2026 Little Giant Fire area, improving safety and restoring forest conditions.”
Little Giant Post-Fire Recovery Project - Phase 1
Purpose and needNot backed yetHazardous fuels reduction, timber recovery and essential road work would support post-fire recovery in the 2026 Little Giant Fire area.
The agency's support is its summary sentence. It calls the road work "essential" and ties all three actions to post-fire recovery in the 2026 Little Giant Fire area. It also lists forest products, fuels management, road management and vegetation management among its project purposes. The notice doesn't describe conditions on the ground, such as fuel loads, hazard trees or damaged roads, and doesn't explain why removing burned timber is part of recovery. The project is listed as "Developing Proposal," with an environmental assessment expected.
The agency’s words +Hide the words
The agency says
“The Okanagan-Wenatchee National Forest is proposing hazardous fuels reduction, timber recovery, and essential road work to support post‑fire recovery in the 2026 Little Giant Fire area, improving safety and restoring forest conditions.”
Little Giant Post-Fire Recovery Project - Phase 1
EffectsNot backed yetFuels reduction, timber recovery and road work in the burn area will improve safety and restore forest conditions.
The agency's support is its one-sentence summary. The notice doesn't say what safety hazards exist, how many acres would be logged or treated, which roads would be worked on, or how removing burned timber would restore forest conditions. It points to project documents in a widget and on Pinyon Public, which aren't in this text. Its status is listed as "Developing Proposal."
The agency’s words +Hide the words
The agency says
“The Okanagan-Wenatchee National Forest is proposing hazardous fuels reduction, timber recovery, and essential road work to support post‑fire recovery in the 2026 Little Giant Fire area, improving safety and restoring forest conditions.”
Little Giant Post-Fire Recovery Project - Phase 1
How this was read
Read from the agency’s own notice ↗, the notice that opens this window; the full analysis comes later, so what it leaves unsupported is what to ask it to show. Every quote is checked word for word against it, a claim marked contradicted stands on a quote from the same document, and a second reading argued the agency’s side of every verdict before it was published. The verdicts are our reading; the quotes are the agency’s. A court can set aside agency action it finds “arbitrary, capricious, an abuse of discretion, or otherwise not in accordance with law” (5 U.S.C. 706(2)(A) ↗), which is why these gaps are worth putting in the record.
In the agency’s own words
The Okanagan-Wenatchee National Forest is proposing hazardous fuels reduction, timber recovery, and essential road work to support post‑fire recovery in the 2026 Little Giant Fire area, improving safety and restoring forest conditions.
Who signs it
PLAN hasn’t read a signer into its record for this fight. The decision on file carries the signature: 20261118_LittleGiantPhase1_FONSI_Final ↗.
The ground
The window has closed, so there’s no watch to set on it here.
The photograph on this page: Okanogan-Wenatchee National Forest, Washington. More Than Just Parks.
In court on this ground
No court case we track is over Okanogan National Forest and Wenatchee National Forest.
Who holds the vote
PLAN’s record doesn’t tie a member of Congress to this fight yet. The scorecard grades the votes and bills that decide public lands; nothing joins a vote or a bill to this decision, so there’s no member to name here without guessing.
See how your members vote ↗Forest ServiceWe track this on the agency’s own system of record, where most on-the-ground decisions live.
On the record for this fight
4 people told us they filed on this fight through PLAN; we haven’t found any of their letters on the agency’s record yet.
- Amy M.73 seals
- Christopher G., New York27 seals
- Angeline58 seals
- Judith A.82 seals
Ranked on letters found on the agency’s record, then letters filed. Readers appear as first name and last initial, or as a steward in their state; switch yours off in your record. All boards
Know an open comment period we are missing, or spotted a wrong deadline? .
More fights that need you
Go deeper for free
See how your members of Congress vote on public lands
Every representative, graded on the votes that decide the fate of parks, forests, and refuges.
Open ↗The mapSee the places under active threat
A live map of the parks, monuments, and wild country in the crosshairs right now.
Open ↗A wrong fact, a dead link, a form that wouldn’t take your letter: one tap and it comes to the people who build PLAN, with this fight attached.