All fights
Record closed October 26, 2026
Okanogan-Wenatchee National Forest, Washington

Comments closed October 26 · decided

Demand Site-Specific Analysis Before Approving Little Giant Post-Fire Salvage

Okanogan-Wenatchee National Forest, WashingtonMore Than Just Parks
What
The agency has approved undisclosed post-fire salvage activities starting November 13, 2026, based entirely on a national-scale programmatic EA rather than any site-specific analysis of the Little Giant fire area.
Where
Okanogan-Wenatchee National Forest, WA
Decided
Comments closed October 26, 2026. The decision is on file: 20261118_LittleGiantPhase1_FONSI_Final. Open it ↗Date from Forest Service CARA comment page ↗, read October 29, 2026.
Where these four lines come from
  • WhatOur plain-English read of the Forest Service project page ↗. Check it against the agency’s own words under Case.
  • WhereThe places and states the project page names, as PLAN read them.
  • ≥8 inches of compacted snow or frozen ground“All ground-based operations occur during winter on ≥8 inches of compacted snow or frozen ground.” Determination of No Significant Impacts Open the document ↗
  • no sooner than November 13, 2026“I intend to implement the approved activities no sooner than November 13, 2026.” Anticipated Implementation of Authorized Activities Open the document ↗
  • DecidedOctober 26, 2026, from Forest Service CARA comment page, the notice text ↗: “requested through 10/26/2026 11:59:59 PM (Pacific Standard Time)”. Read October 29, 2026. The decision document is the one on file in PLAN’s record.
  • Read from PLAN’s record November 29, 2026.

What the proposal said, and what the decision did

PLAN has read 5 figures from the proposal and the decision here, and a person hasn't checked them yet. They go here once someone has.

Did the agency answer?

PLAN found 10 issues in the agency’s analysis.

Each issue against the decision not yet reviewed

  • PLAN’s match, not yet checked by a personThe FONSI approves post-fire salvage logging and hazard tree removal on the Okanagan-Wenatchee National Forest by relying entirely on a generic national-level programmatic EA rather than conducting any site-specific NEPA analysis.

    The FONSI approves post-fire salvage logging and hazard tree removal on the Okanagan-Wenatchee National Forest by relying entirely on a generic national-level programmatic EA rather than conducting any site-specific NEPA analysis.

    The section 'Documentation Informing the FONSI' says the decision relies on and incorporates by reference the PFREA, a document hosted at a national disaster-recovery webpage. The irreversible-commitment rationale then confirms the analysis was performed at the 'national scale,' not the site scale. NEPA requires analysis of the specific proposed action in its actual environment, not application of a national template by reference. The agency should prepare a site-specific Environmental Assessment or Environmental Impact Statement for the Little Giant fire area, or provide a detailed demonstration with site-specific data showing how the PFREA's national-scale assumptions apply to the conditions of the 2026 Little Giant fire perimeter.

    A hole PLAN found in the agency’s own analysis

    “The Little Giant Post-Fire Recovery – Phase 1 Determination Analysis Reliance (DAR) provides additional details on how the PFREA supports this FONSI. Other supporting documentation includes the Little Giant – Phase 1 Biological Evaluation Checklist, preliminary Biological Assessment, and Forest Plan Compliance.”

    The agency’s own words, 20261118_LittleGiantPhase1_FONSI_Final ↗, Documentation Informing the FONSI · PLAN’s match, unchecked, an answer in part

  • PLAN’s match, not yet checked by a personUnder 'Activities Approved,' the FONSI approves post-fire recovery activities without disclosing a single project-scale quantity: no acreage to be treated, no board feet to be harvested, no miles of road to be maintained, no hazard-tree count, no species inventory.

    Under 'Activities Approved,' the FONSI approves post-fire recovery activities without disclosing a single project-scale quantity: no acreage to be treated, no board feet to be harvested, no miles of road to be maintained, no hazard-tree count, no species inventory.

    The entire project scope is deferred to an external Determination Analysis Reliance (DAR) document not reproduced in the FONSI. A member of the public cannot make an informed or meaningful comment on an approval that describes its scope only as activities described in an external document. The agency should disclose all project quantities in the FONSI itself and extend the comment period to allow meaningful public review once that information is available.

    A hole PLAN found in the agency’s own analysis

    “eliminating more than 1,500 acres of potential area timber harvest; reducing the maximum slope eligible for harvest activities from 45 percent to 40 percent; and establishing a maximum contiguous area harvest patch size of 40 acres.”

    The agency’s own words, 20261118_LittleGiantPhase1_FONSI_Final ↗, Notable Changes · PLAN’s match, unchecked, an answer in part

  • PLAN’s match, not yet checked by a personThe irreversible-commitment rationale explicitly states the analysis was done at 'the national scale,' not at the Little Giant site.

    The irreversible-commitment rationale explicitly states the analysis was done at 'the national scale,' not at the Little Giant site.

    This admission confirms no site-specific review of the 2026 Little Giant fire perimeter has been performed. Local conditions such as slope, soil type, hydrology, snag density, proximity to drinking water sources, and species composition may differ materially from national-scale assumptions built into the PFREA. The agency should analyze site-specific conditions and explain with data how the PFREA's national-scale conclusions apply to the particular landscape of the Little Giant fire area.

    A hole PLAN found in the agency’s own analysis

    “Based on the analysis documented in the Little Giant Phase 1 DAR and the PFREA, I determined that the implementation of the proposed action would not result in irreversible or irretrievable commitments of resources that diminish the long-term productivity of the human environment.”

    The agency’s own words, 20261118_LittleGiantPhase1_FONSI_Final ↗, Determination of No Significant Impacts · PLAN’s match, unchecked, an answer in part

  • PLAN’s match, not yet checked by a personThe FONSI concludes that no-action consequences outweigh the short-term impacts of Phase 1, but cites no site-specific data to support this comparison.

    The FONSI concludes that no-action consequences outweigh the short-term impacts of Phase 1, but cites no site-specific data to support this comparison.

    No hazard-tree inventory, no fuel-load measurements, no reburn probability model, and no site-specific insect or disease susceptibility analysis are provided for the Little Giant fire perimeter. The no-action analysis is a list of generic post-fire harms stated as assertions with no quantification or citation to site conditions. A reasoned NEPA decision requires grounding in actual data about the specific site. The agency should provide site-specific inventories and studies supporting its no-action consequence claims before finalizing this decision.

    A hole PLAN found in the agency’s own analysis

    “Based on the analysis documented in the PFREA and my review of current conditions and management needs within the Little Giant fire area, I have determined that the environmental effects of the proposed action are not significant”

    The agency’s own words, 20261118_LittleGiantPhase1_FONSI_Final ↗, Determination of No Significant Impacts · PLAN’s match, unchecked, an answer in part

  • PLAN’s match, not yet checked by a personThe FONSI contains no mention of tribal consultation, no reference to Section 106 of the National Historic Preservation Act, no disclosure of cultural resource survey results, and no identification of Tribal governments whose ancestral or treaty lands may fall within the 2026 Little Giant fire perimeter.

    The FONSI contains no mention of tribal consultation, no reference to Section 106 of the National Historic Preservation Act, no disclosure of cultural resource survey results, and no identification of Tribal governments whose ancestral or treaty lands may fall within the 2026 Little Giant fire perimeter.

    The entire cultural-resource analysis rests on the claim that winter snow prevents soil contact. Winter operations and snow cover are not substitutes for the government-to-government consultation and pre-disturbance cultural surveys legally required before ground-disturbing activities begin. The agency should disclose the Section 106 consultation record, any site-specific cultural surveys conducted, and any tribal government consultation undertaken for this project area.

    A hole PLAN found in the agency’s own analysis

    “Project Design Criteria incorporated from the PFREA, together with additional Little Giant Phase 1 design criteria (DAR Appendix B, Tables B1 and B2), require winter-only operations, protection of riparian and aquatic resources, retention of wildlife habitat, biological legacies and coarse woody debris, avoidance of sensitive plant habitats, and protection of cultural resources.”

    The agency’s own words, 20261118_LittleGiantPhase1_FONSI_Final ↗, Determination of No Significant Impacts · PLAN’s match, unchecked, an answer in part

Decision notice: 20261118_LittleGiantPhase1_FONSI_Final ↗