- What
- The agency is asking the public to accept a FONSI covering 1,500-plus active authorizations on 9,580 miles of national forest land while admitting it has not completed ESA or NHPA compliance.
- Where
- National Forests in Alabama, AL
- How much
- Active utility and communications authorizations in Region 8: over 1,500 active authorizations. NFS land covered by existing authorizations: approximately 9,580 miles. Covered by existing utility authorizations: 38,499 acres.
- By when
- Comments to U.S. Forest Service by November 20, 2026.Date from Forest Service CARA comment page ↗, read October 29, 2026.
What to ask forAll 8 points →
The agency must correct the FONSI to accurately describe the selected action or withdraw and reissue both documents together so the public can comment on a consistent record.
Where these four lines come from
- WhatOur plain-English read of the Forest Service project page ↗. Check it against the agency’s own words under Case.
- WhereThe places and states the project page names, as PLAN read them.
- over 1,500 active authorizations“over 1,500 active authorizations for linear utilities and communications uses on approximately 9,580 miles of NFS land covering 38,499 acres” Purpose and Need Open the document ↗
- approximately 9,580 miles“over 1,500 active authorizations for linear utilities and communications uses on approximately 9,580 miles of NFS land covering 38,499 acres” Purpose and Need Open the document ↗
- 38,499 acres“approximately 9,580 miles of NFS land covering 38,499 acres (note that some of these uses overlap so actual land use is lower)” Purpose and Need Open the document ↗
- By whenNovember 20, 2026, from Forest Service CARA comment page, the notice text ↗: “requested through 11/20/2026 11:59:59 PM (Eastern Standard Time)”. Read October 29, 2026.
- Read from PLAN’s record November 13, 2026.
Two ways to be heard on this, and both count. Comment for the legal record, then call the members who answer to you.
Comment nowWhat to say
Make these points, in your own words
The FONSI describes the selected action as a framework for 'emergency response actions and issuance of closure orders,' but the EA itself proposes a framework for routine utility and communications special uses including new construction, ROW expansion, and long-term vegetation management.Read the point +
This internal contradiction means the FONSI does not actually evaluate the action the EA analyzes. The agency must correct the FONSI to accurately describe the selected action or withdraw and reissue both documents together so the public can comment on a consistent record.
Appendix A's trend data, which is the empirical foundation for the FONSI, shows that Threatened and Endangered species received only 2 mentions and Fish/Aquatic Resources only 1 mention across 503 reviewed projects, yet Appendix D lists hundreds of listed species across all 14 forests.Read the point +
The near-total absence of ESA and aquatic species analysis in the underlying project record means the conclusion that effects are predictably minimal is not supported by the data the agency itself cites. The agency should commission and incorporate a species-specific analysis drawing on projects that actually documented listed-species interactions before issuing a FONSI.
The EA states the proposed action includes 'construction of new utility lines, expansion or realignment of existing ROWs, and associated long-term vegetation management' outside previously disturbed areas, yet the FONSI's bounded-scope rationale claims effects are constrained because activities are 'typically confined to existing disturbed areas' and the EA 'excludes new permanent infrastructure.'Read the point +
These two statements directly contradict each other. The agency must reconcile this conflict and analyze the full range of new-disturbance activities in a supplemental analysis or EIS before authorizing any project under this framework.
The EA covers over 1,500 active authorizations on approximately 9,580 miles of NFS land covering 38,499 acres, plus 130 active applications and 57 expiring authorizations, yet the cumulative effects analysis contains no numerical estimate of total acreage disturbed annually, no projection of new ROW miles, and no aggregate assessment of combined impacts across forests.Read the point +
NEPA requires analysis of cumulative effects of past, present, and reasonably foreseeable actions. The agency must prepare a quantitative cumulative effects analysis before issuing a FONSI for a region-wide framework of this scale.
The Appendix A trend report, which the agency uses as the primary empirical basis for the programmatic framework, found zero projects with beneficial or improvement effects and recorded 44 projects with adverse or negative effects, yet the body of the EA repeatedly concludes that effects are consistently minimal or non-significant.Read the point +
The agency never explains why 44 adverse-effect projects do not trigger additional analysis or preclude a FONSI. The agency must explain in the decision record how 44 documented adverse or negative outcomes are consistent with a finding of no significant impact, or prepare an EIS.
The EA's Appendix A explicitly recommends that 'other topics (wildlife, cultural resources, air, noise, recreation) should be covered at a regional scale, with site-specific reliance where warranted,' yet the body of the EA's resource analyses for wildlife and cultural resources contain no quantitative regional-scale data, deferring all substantive determinations to project level.Read the point +
The agency's own scoping guidance was not followed in preparing the EA. The agency must supplement the EA with the regional-scale wildlife and cultural resource analysis its own appendix called for, or prepare an EIS.
The EA states that tribal consultation under EO 13175 will occur 'before project actions are taken that may significantly affect tribal lands, resources, or interests,' and that EO 13007 compliance will be initiated 'as early in the process as reasonably possible,' but the document contains no record of any tribal consultation having taken place before this programmatic decision.Read the point +
A programmatic framework that pre-authorizes hundreds of future projects across 13 million acres without prior tribal input does not satisfy either executive order. The agency must provide documentation of government-to-government consultation with all affected Tribes conducted prior to the programmatic decision, or suspend the decision until that consultation is complete.
The EA's Certifying Statement acknowledges that the responsible official exercised discretion 'including the decision to briefly address or omit issues deemed comparatively less substantive,' yet the document contains no analysis of air quality, noise, or socioeconomic effects beyond single-line mentions in the Appendix A resource table.Read the point +
Appendix A recorded 9 air quality mentions, 3 noise mentions, and 1 socioeconomics mention across 503 projects. For a framework covering 13 million acres and activities that include directional boring, heavy equipment staging, and herbicide application, omitting these resource analyses without reasoned justification is arbitrary. The agency must provide a reasoned explanation for omitting these resources or analyze them before issuing a FONSI.
Say something only you can say. The law requires the agency to consider and respond to substantive comments, and specifics are what make a comment substantive.
Affects public lands
The agency is asking the public to accept a FONSI covering 1,500-plus active authorizations on 9,580 miles of national forest land while admitting it has not completed ESA or NHPA compliance.
What’s at risk
If this goes through
Our plain-English read of the official notice ↗. Check it against the agency’s own words below.
By the numbers, from the agency’s own document
- Active utility and communications authorizations in Region 8
Purpose and Need
Open the document ↗“over 1,500 active authorizations for linear utilities and communications uses on approximately 9,580 miles of NFS land covering 38,499 acres”
- Miles of NFS land covered by existing authorizations
Purpose and Need
Open the document ↗“over 1,500 active authorizations for linear utilities and communications uses on approximately 9,580 miles of NFS land covering 38,499 acres”
- Acres covered by existing utility authorizations
Purpose and Need
Open the document ↗“approximately 9,580 miles of NFS land covering 38,499 acres (note that some of these uses overlap so actual land use is lower)”
- Active pending applications as of June 2025
Purpose and Need
Open the document ↗“there were 130 active applications for these uses as well as 57 authorizations that would expire by the end of the year”
- Projects in trend dataset with adverse or negative effects
Appendix A: Routine Special Use Activities Trend Report
Open the document ↗“Adverse / Negative 44, Minor / Negligible 7, Moderate 4, Beneficial / Improvement 0”
- Total NFS acres managed by Southern Region
Potentially Affected Environment
Open the document ↗“manages over 13 million acres within its 14 National Forests and two special management areas”
Source: the agency’s document ↗
Testing the agency’s case
What the agency argues, and whether its own record backs it
- 7
- Not fully backed
- 1
- Contradicted by its own record
- 4
- Never analyzed
The Forest Service's Southern Region wants one programmatic environmental assessment to cover routine and new utility and communication work across its national forests. That work includes new lines, corridor expansion and vegetation management with herbicides. The agency says reviewing similar projects one at a time is duplicative, inconsistent and slow, given over 1,500 active authorizations.
“The purpose of this project is to establish a consistent and efficient framework for authorizing routine utility and communication activities on NFS lands within Region 8.”
Purpose and Need
Each Ask below goes into your letter when you write it with PLAN on this page, matched to what you tell it about how this land reaches you.
EffectsContradicted by its own recordThe finding of no significant impact concludes that the selected action won't significantly affect the human environment, because its scope is tightly bounded.
The finding says it rests on the environmental assessment. But it describes a framework for emergency response actions and closure orders. Its stated basis says the assessment excludes new permanent infrastructure and any expansion beyond existing footprints. The proposed action here includes new utility lines, corridor expansion and long-term vegetation management. The reasons the finding gives for limiting effects don't describe this action.
AskWithdraw this finding. Issue one that addresses the actual utility and communications action, including new corridors, expansion and long-term vegetation management, before any decision.
The agency’s words, the record and the law +Hide the words
The agency says
“This finding of no significant impact (FONSI) documents the determination that implementation of the selected action will not result in significant effects to the human environment.”
Finding of No Significant Impact (FONSI)
Elsewhere in the same document
“The proposed action also includes construction of new utility lines, expansion or realignment of existing ROWs, and associated long-term vegetation management necessary to establish and maintain safe and functional utility corridors.”
Proposed Action
“The USDA Forest Service, Southern Region (Region 8), has prepared a programmatic environmental assessment (EA) to evaluate the environmental effects of establishing a regional framework for implementing emergency response actions and issuing closure orders on National Forest System (NFS) lands.”
Finding of No Significant Impact (FONSI)
The law
“An agency shall issue an environmental impact statement with respect to a proposed agency action requiring an environmental document that has a reasonably foreseeable significant effect on the quality of the human environment.” National Environmental Policy Act, 42 U.S.C. 4336(b)(1) ↗
Purpose and needNot fully backedReviewing similar utility projects one at a time causes duplicative analysis, inconsistent records and delays in processing authorizations.
The document's own appendices back most of this. Appendix A says past projects are highly repetitive and predictable in scope and effect, yet each of the 503 got its own review. Appendix B shows categorical exclusion use ranging from 51.4% to 100.0% by forest, and listed-species analysis ranging from 0.00% to 100.0%, which shows inconsistent documentation. The document states the volume: 130 active applications and 57 expiring authorizations as of June 2025. It gives no processing times or backlog data, so the delay point rests on inference.
AskProvide past processing times under categorical exclusions and environmental assessments, and estimate how much faster and cheaper the framework would make authorizations.
The agency’s words, the record +Hide the words
The agency says
“This results in duplicative analysis, inconsistent documentation, and delays in processing special use authorizations.”
Purpose and Need
Elsewhere in the same document
“As of June 2025, there were 130 active applications for these uses as well as 57 authorizations that would expire by the end of the year if not renewed.”
Purpose and Need
EffectsNot fully backedIf standard practices are applied, effects on soils and water stay within project footprints and below significant levels, as past project review shows.
Appendix C says hydrologists found effects across all reviewed projects to be short-term and not measurable at the watershed scale. It says effects typically stayed less than 50 feet from the work and lasted 1 to 14 days on average. It says long-term effects were generally none unless poor implementation occurred, which it calls rare. But Appendix A counts soils in only 4 project documents and water resources in 89, while Appendix C says over 70% of projects cross a stream. The document presents no monitoring data showing how often best management practices were carried out correctly, and its conclusion depends on that condition.
AskProvide the inspection or monitoring data on past utility projects that shows how often best management practices were applied correctly and how water quality was measured.
The agency’s words, the record and the law +Hide the words
The agency says
“Effects on soils and hydrology are expected to be spatially limited to project footprints, and past project review confirms that if managed through application of existing PDFs, BMPs, and regulatory requirements, impacts are consistently and effectively managed to non-significant levels.”
Conclusion
Elsewhere in the same document
“Over 70% of linear utility projects involve at least one stream crossing, making this the dominant hydrologic factor.”
Stream Crossings (Highest-Frequency Impact)
“Projects do not produce measurable cumulative watershed effects when BMPs are implemented correctly.”
5. Cumulative Hydrologic Patterns Across Projects
The law
“An agency shall issue an environmental impact statement with respect to a proposed agency action requiring an environmental document that has a reasonably foreseeable significant effect on the quality of the human environment.” National Environmental Policy Act, 42 U.S.C. 4336(b)(1) ↗
Show 5 more claims +Show fewer
EffectsNot fully backedEffects on listed species are low because most work happens in corridors that are already modified, and past reviews mostly found no effect or minor effects.
The agency says its review of past projects that used design features, best management practices and mitigation found most activities resulted in "No Effect" or "Not Likely to Adversely Affect" determinations. It requires project-level Endangered Species Act review before any work and formal consultation for any action likely to adversely affect a listed species. Appendix B also warns that incomplete documentation limited some summary metrics. But the document never tallies those past determinations. Appendix A counts threatened and endangered species in only 2 project documents. Appendix B shows only 95 projects (24.42%) included an effects analysis for listed species, with 0.00% for one forest.
AskPublish the count of past listed-species determinations by category, including any likely-to-adversely-affect findings, and the forests and species involved.
The agency’s words, the record and the law +Hide the words
The agency says
“Most routine utility activities occur within previously disturbed corridors where habitat conditions have already been modified by ongoing vegetation maintenance and infrastructure presence.”
Threatened, Endangered, Proposed, and Candidate Species and Critical Habitat
Elsewhere in the same document
“While these projects are included in the total number of projects reviewed, incomplete documentation limited their inclusion in certain summary metrics and detailed breakdowns.”
Appendix B: Routine Special Use Effects Breadth by Forest
The law
“Each Federal agency shall, in consultation with and with the assistance of the Secretary, insure that any action authorized, funded, or carried out by such agency (hereinafter in this section referred to as an "agency action") is not likely to jeopardize the continued existence of any endangered species or threatened species” Endangered Species Act, 16 U.S.C. 1536(a)(2) ↗
EffectsNot fully backedWith required design features and forest plan protections, the action won't reduce the viability of any sensitive species or species of conservation concern across the region.
The finding rests on required forest plan standards and project-level checks for habitat, buffers and scope. But the document names no sensitive species or species of conservation concern, and Table 3 only links to forest planning pages. Several design features apply only "where practicable." The Conclusion also says this assessment doesn't satisfy sensitive-species compliance, so no analysis backs the region-wide finding.
AskIdentify the sensitive species likely to meet utility work on each forest, and show how design features limited by "where practicable" prevent loss of viability.
The agency’s words, the record and the law +Hide the words
The agency says
“When implemented with required design features and LMP protections, the proposed action will not contribute to a trend toward federal listing nor reduce the viability of SCC or RFSS populations across Region 8.”
Sensitive Species (FSM 2670)
Elsewhere in the same document
“This programmatic environmental assessment does not satisfy compliance requirements under Section 7 of the Endangered Species Act (ESA) or FSM 2670 because compliance is required to be completed at the project level.”
Conclusion
The law
“Resource plans and permits, contracts, and other instruments for the use and occupancy of National Forest System lands shall be consistent with the land management plans.” National Forest Management Act, 16 U.S.C. 1604(i) ↗
EffectsNot fully backedThe action isn't expected to cause adverse effects to historic properties.
The agency's support has three parts. The assessment approves no site-specific undertaking. Each authorization must finish historic preservation review before it goes forward, including identification, effects assessment and consultation with State Historic Preservation Officers and Tribes. Appendix C reports avoidance through small route shifts, with virtually no adverse effects. But that review process can end in resolving adverse effects rather than avoiding them, so by itself it doesn't support a finding of no adverse effects. Appendix A counts cultural resources in only 4 past project documents. Appendix C says disturbance occurs once, while the Soils section expects repeated access within corridors.
AskExplain what supports the no-adverse-effect expectation, report how many past projects had cultural surveys, and address repeated disturbance from long-term corridor maintenance.
The agency’s words, the record and the law +Hide the words
The agency says
“Because this PEA does not analyze site-specific ground-disturbing activities with the potential to affect historic properties, implementation of the proposed action is expected to not result in adverse effects to historic properties.”
Rationale for Determination
Elsewhere in the same document
“Mentions of cultural, wildlife, and air quality resources were less frequent, indicating minimal potential for adverse effects or the presence of standard mitigation practices.”
Resource Analysis Trends
“In areas where utility corridors are established or expanded, long-term conditions may include maintained vegetation, repeated access, and localized changes in soil structure within the corridor footprint.”
Soils
The law
“shall take into account the effect of the undertaking on any historic property.” National Historic Preservation Act, 54 U.S.C. 306108 ↗
ScienceNot fully backedThe agency's review of 503 past projects shows most routine utility work was handled with categorical exclusions because its effects were minor.
Appendix A reports that more than 80% of 503 projects used categorical exclusions. Appendix B warns that incomplete documentation kept some projects out of its summary metrics, so some totals and percentages "may not align precisely." Even so, Appendix B's totals show only 351 categorical exclusions (69.8%) and 38 environmental assessments (7.6%) out of 503. Several existing right-of-way shares run above 100%, such as 110.0%. The document doesn't show how it reached more than 80%, so the table it rests on doesn't back that figure.
AskCorrect the past-project figures. Explain the 114 projects without a listed category and the percentages above 100 percent, and release the underlying dataset.
The agency’s words and the law +Hide the words
The agency says
“More than 80% of projects (n=503) were processed using Categorical Exclusions (CEs).”
NEPA Documentation Trends
The law
“ensure the professional integrity, including scientific integrity, of the discussion and analysis in an environmental document; (E) make use of reliable data and resources in carrying out this chapter;” National Environmental Policy Act, 42 U.S.C. 4332(2)(D)-(E) ↗
ScienceNot fully backedPatterns from past projects are consistent enough that one programmatic analysis can cover all the covered activities, including new corridors and expansions.
The agency points to Appendix A's review of 503 past projects. Appendix C's land use report says that review also found projects with new alignments, extensions or localized corridor expansion, and that changes stayed within the corridor footprint. Projects with greater disturbance would need more review. But Appendix A says the dataset is dominated by renewal, amendment and maintenance of existing rights-of-way. Appendix B counts only 54 new right-of-way projects (13.88%) and 20 expanded-area projects (5.14%). The document doesn't break out effects for those projects, even though the framework covers new lines, expansion and realignment.
AskReport effects data separately for past new right-of-way and expanded-area projects, or limit the framework to work inside existing corridors.
The agency’s words, the record and the law +Hide the words
The agency says
“Based on these consistent patterns and observed outcomes, a programmatic environmental assessment provides an appropriate level of analysis.”
Environmental Effects Review
Elsewhere in the same document
“The dataset is dominated by renewal, amendment, and maintenance of existing utility and telecommunications ROWs.”
Activity and Project Type
“Across reviewed projects (2015–2024), routine linear utility activities occurred almost exclusively within existing authorized ROWs and previously disturbed corridors.”
3. Overview of Land Use Interaction Patterns
The law
“ensure the professional integrity, including scientific integrity, of the discussion and analysis in an environmental document; (E) make use of reliable data and resources in carrying out this chapter;” National Environmental Policy Act, 42 U.S.C. 4332(2)(D)-(E) ↗
What the document never analyzes
Not analyzedWildfire risk from power lines
The action covers new and upgraded overhead power lines and hazard tree removal across over 13 million acres, and the document names drought conditions. No section looks at fires started by utility lines or fires that threaten them.
Searched all 86 pages for ‘wildfire’, ‘ignition’, ‘fire risk’. None appear.
AskAnalyze the risk of wildfire ignition from new and upgraded power lines, and how vegetation clearance and hazard tree standards address it.
Not analyzedGroundwater and cave habitats
The action includes trenching, sewer lines and wastewater discharge lines. Appendix D lists cave species such as the Ozark cavefish, Benton County cave crayfish and Madison Cave isopod.
Searched all 86 pages for ‘groundwater’, ‘aquifer’, ‘karst’. None appear.
AskAnalyze how trenching, sewer lines and wastewater discharge could affect groundwater and cave habitats for the listed cave species.
Not analyzedListed bat roosting habitat
Appendix D lists gray, Indiana, northern long-eared and tricolored bats on most forests, and the action includes removing hazard trees outside rights-of-way. No bat roosting habitat or bat-specific clearing timing is analyzed.
Searched all 86 pages for ‘roost’, ‘hibernacula’, ‘maternity’. None appear.
AskAnalyze how tree removal affects roosting habitat for listed bats, and state when clearing would be restricted to protect them.
Not analyzedBird collisions and electrocution
The action covers new overhead lines and communication towers. Appendix D lists the whooping crane, Mississippi sandhill crane, Puerto Rican parrot and two listed Puerto Rican hawks.
Searched all 86 pages for ‘collision’, ‘electrocution’, ‘raptor’. None appear.
AskAnalyze the risk of bird collisions and electrocution from new overhead lines and towers, and name the design standards that would reduce it.
How this was read
Read from the agency’s own decision document ↗, all 86 pages. Every quote is checked word for word against it, a claim marked contradicted stands on a quote from the same document, and a second reading argued the agency’s side of every verdict before it was published. The verdicts are our reading; the quotes are the agency’s. A court can set aside agency action it finds “arbitrary, capricious, an abuse of discretion, or otherwise not in accordance with law” (5 U.S.C. 706(2)(A) ↗), which is why these gaps are worth putting in the record.
In the agency’s own words
This programmatic environmental assessment analyzes effects of routine activities related to utilities and communications special uses on national forests in the Southern Region and establishes a consistent and efficient framework for authorizing these activities.
Who signs it
The notice names no signer PLAN could read. PLAN names a decision-maker only when the document names one.
The ground
This fight isn’t bound to a map place in PLAN’s record yet. The notice names National Forests in Alabama (AL); none is a unit on the threatened lands map, so there’s no place page to open or watch.
In court on this ground
This fight isn’t bound to a land unit in PLAN’s record yet, so there are no court cases to show for its ground.
Who holds the vote
PLAN’s record doesn’t tie a member of Congress to this fight yet. The scorecard grades the votes and bills that decide public lands; nothing joins a vote or a bill to this decision, so there’s no member to name here without guessing.
See how your members vote ↗Calling your two senators and your representative is the Call door on this page.
Forest ServiceWe track this on the agency’s own system of record, where most on-the-ground decisions live.
Know an open comment period we are missing, or spotted a wrong deadline? .
More fights that need you
Go deeper for free
See how your members of Congress vote on public lands
Every representative, graded on the votes that decide the fate of parks, forests, and refuges.
Open ↗The mapSee the places under active threat
A live map of the parks, monuments, and wild country in the crosshairs right now.
Open ↗A wrong fact, a dead link, a form that wouldn’t take your letter: one tap and it comes to the people who build PLAN, with this fight attached.