← All actions
Record closed July 24, 2026
Affects public lands

Stop geothermal leasing on Carson City public lands

Carson City District October 2026 Competitive Geothermal Lease Sale

Bureau of Land Management· Carson City District public landsBLM NEPA Register DOI-BLM-NV-C000-2026-0001-EA ↗

BLM ePlanningWe track this on the agency’s own system of record, where most on-the-ground decisions live.

The groups on this fight

4 groups work Nevada

By footprint, from the same match the STAND matchmaker runs; none is linked to this decision in our record yet. Give straight to them; nothing routes through us.

Every group above is on STAND for Public Lands, with its court record, its filings and who backs it.

Nevada public lands face industrial geothermal development with limited ability to reverse leasing decisions once made.

What’s at risk

Public lands in Nevada's Carson City District could be locked into geothermal energy leases, opening them to drilling, roads, and infrastructure. Once parcels are leased, development rights are legally difficult to revoke.

If this goes through

Selected parcels will be leased for geothermal development, committing those public lands to industrial use and limiting future conservation or recreation options permanently.

Our plain-English read of the official notice ↗. Check it against the agency’s own words below.

6 holes in the agency’s own analysis

What the public could have raised, from the agency’s own document

  • I oppose this action as proposed, and I ask the agency to weigh the specific harms below.
  • The EA defers detailed analysis of site-specific impacts until later NEPA reviews, claiming that 'Potential impacts are analyzed in a general sense because information on components such as specific information is not available at this time' and 'These types of site-specific elements would be analyzed under future NEPA' (Section 3.2.3). This violates the rule against segmented NEPA review. The agency should either conduct a programmatic analysis addressing the range of foreseeable impacts, or acknowledge that the current EA cannot support a reasoned decision and prepare an EIS that addresses the full scope of likely development scenarios across all parcels.
  • The ranching impact analysis (Section 3.2.5) acknowledges that lease parcels could represent '0.7 and 24 percent of the total area of each of the affected grazing allotments' yet states 'It is important to note that the entirety of the lease parcel area is not likely to be developed under the RFD scenario, but the extent of potential development is currently unknown.' This is circular reasoning: if the extent of development is unknown, the agency cannot estimate impacts to grazing. The document should either quantify the probable acreage of development per parcel based on the stated RFD, or acknowledge the analysis is inadequate and prepare an EIS with reasoned estimates of development intensity.
  • The cultural resources section relies on a Class II survey of only 205 acres (or approximately 0.6 percent) of the 32,175.71 acres nominated, yet concludes that survey is sufficient for a leasing-stage decision (Section 4.3 and Section 3.2.6). The document states 'Approximately 11.04% of the total parcel acreage has been surveyed at the Class III level to date; un-surveyed areas are likely to contain additional resources.' This means 89% of the parcels remain unsurveyed at project stage resolution. The agency should either conduct Class III surveys on all parcels before leasing or explain in the decision record why incomplete cultural resource information is acceptable for a 10-year lease commitment.
  • The document relies on general mitigation measures and Best Management Practices (BMPs) without verifying their effectiveness or enforceability. For example, dust control is described as 'water dirt roads during periods of high use to reduce fugitive dust emissions' (Section 3.2.1) and the document states emissions 'would not be expected to cause a discernible change to existing air quality,' yet provides no monitoring protocol or enforcement mechanism if BMPs fail. The agency should explain how it will ensure BMPs are implemented and what recourse exists if air quality impacts exceed estimates.
Show all 8 points from the document
  • The socioeconomic analysis predicts housing and service impacts but defers detailed assessment to later stages (Section 3.2.2). The document acknowledges that 'temporary workforce influxes could exacerbate existing conditions by increasing demand for rental housing, hotel rooms, trailer spaces, and other short-term accommodations, potentially placing additional short-term pressure on local services and infrastructure' yet provides no analysis of cumulative impacts if multiple parcels are developed simultaneously, no consultation with county planners about absorption capacity, and no mitigation plan. The agency should conduct or commit to conduct coordination with county planning authorities and develop a mitigation plan for infrastructure impacts before approving the lease sale.
  • The Bi-State Greater Sage-Grouse analysis applies a No Surface Occupancy stipulation only to parcel NV-2026-10-2109 (Section 3.2.3 and Appendix D), yet the document lists proposed threatened status for the species and notes that active leks occur within 14 miles of parcels. The rationale for why other parcels near sage-grouse habitat do not receive protective stipulations is not explained. The agency should either extend NSO stipulations to all parcels within the influence distance of active leks, or provide a documented biological rationale for the current stipulation boundaries that can be challenged in comment.
  • Say something only you can say. The law requires the agency to consider and respond to substantive comments, and specifics are what make a comment substantive.
Every point is checked against the agency’s own decision document ↗. 6 findings verified against the text, word for word.

In the agency’s own words

The purpose of the Proposed Action is to lease lands for development of geothermal resources where appropriate, consistent with the Geothermal Steam Act of 1970, the Federal Geothermal Leasing Reform Act of 1987, the Energy Policy Act of 2005, and related executive orders, in a manner that will promote use of clean technology and prevent unnecessary or undue degradation of public lands, resources, and uses. Geothermal leasing is also consistent with BLM’s multiple-use and sustained-yield mandate under the Federal Land Policy and Management Act of 1976 (FLPMA) as amended. Lands eligible for geothermal leasing for…

BLM NEPA Register DOI-BLM-NV-C000-2026-0001-EA ↗

The reporting behind this

From More Than Just Parks

More actions that need you

Go deeper, free

A wrong fact, a dead link, a form that wouldn’t take your letter: one tap and it comes to the people who build PLAN, with this fight attached.

Know an open comment period we are missing, or spotted a wrong deadline? .