Stop Capling SR29 Mine from filling 5.15 acres of freshwater wetlands

U.S. Army Corps of Engineers · freshwater herbaceous wetlands (5.15 acres), SR 29 corridor wetland system

What
A commercial excavation mine would permanently destroy 5.15 acres of freshwater herbaceous wetlands along the SR 29 corridor.
Where
freshwater herbaceous wetlands (5.15 acres), SR 29 corridor wetland system
How much
5.15 acres of freshwater herbaceous wetlands in the SR 29 corridor would be filled and excavated to build a 140.11-acre commercial mining operation.
By when
Comments to U.S. Army Corps of Engineers by December 6, 2026.Date from Army Corps public notice (Regulatory Request System) ↗, read November 9, 2026.

What to ask forAll 3 points →

Authorizing discharge of dredged or fill material into 5.15 acres of freshwater herbaceous wetlands to build a commercial excavation mining operation destroys wetland habitat that cannot simply be replaced.

Where these four lines come from
Now make it count27 days left

Two ways to be heard on this, and both count. Comment for the legal record, then call the members who answer to you.

Comment now

3 holes in the agency’s own analysis

Make these points, in your own words

  • Authorizing discharge of dredged or fill material into 5.15 acres of freshwater herbaceous wetlands to build a commercial excavation mining operation destroys wetland habitat that cannot simply be replaced.
  • The proposed 140.11-acre commercial excavation mine along the SR 29 corridor would permanently alter the wetland system that runs through that landscape.
  • Filling freshwater herbaceous wetlands for mining purposes eliminates the water filtration, flood control, and wildlife habitat functions those wetlands provide to the surrounding area.

Say something only you can say. The law requires the agency to consider and respond to substantive comments, and specifics are what make a comment substantive.