New Era Energy & Digital
Texas Critical Data Centers (TCDC) Campus
Ector County, Texas
Under construction · first reported Jan 30, 2026
- Capacity
- 250 MWannounced
- To protected land
- 95mifrom Pecos River\canyons Complex Area of Critical Environmental Concern
- Capacity250 MWannounced: “signed a letter of intent (LOI) with Grow Odessa to acquire a 200-acre site in Ector County in West Texas for the development of a 250MW AI/HPC data center that will be powered via natural gas from New Era.”
- FootprintLarge with capacity not disclosed
- Grid regionERCOT
The source
“signed a letter of intent (LOI) with Grow Odessa to acquire a 200-acre site in Ector County in West Texas for the development of a 250MW AI/HPC data center that will be powered via natural gas from New Era.”Data Center Dynamics
Source-checked, read back against the document on Sep 10, 2026.
What’s happened here
Nothing dated on this site yet beyond its listing. A hearing, a filing, a vote, a photograph from the road: if you know of one, it belongs here.
Add to the record
What you post goes on this page the moment its source checks, labeled as a reader’s report. We don’t edit it and we don’t take sides on it.
Something on this page wrong?
Tell us what’s wrong and where you saw it. We check it in the public record, and a listing that changes says so on this page.