Back to the mapSee this site on the map/All of Texas
New Era Energy & Digital
Texas Critical Data Centers (TCDC) Campus
Ector County, Texas
Under construction · first reported Jan 30, 2026
- Capacity
- 250 MWannounced
- To protected land
- 95mifrom Pecos River\canyons Complex Area of Critical Environmental Concern
- Capacity250 MWannounced: “signed a letter of intent (LOI) with Grow Odessa to acquire a 200-acre site in Ector County in West Texas for the development of a 250MW AI/HPC data center that will be powered via natural gas from New Era.”
- FootprintLarge, capacity not disclosed
- Grid regionERCOT
The source
“signed a letter of intent (LOI) with Grow Odessa to acquire a 200-acre site in Ector County in West Texas for the development of a 250MW AI/HPC data center that will be powered via natural gas from New Era.”Data Center Dynamics
Source-checked, read back against the document on Sep 10, 2026.
What’s happened here
Nothing dated on this site yet beyond its listing. A hearing, a filing, a vote, a photograph from the road: if you know of one, it belongs here.
Add to the record
What you post goes on this page the moment its source checks, labeled as a reader’s report. We don’t edit it and we don’t take sides on it.
Something on this page wrong?
Tell us what’s wrong and where you saw it. We check it against the record, and a listing that changes says so on this page.