Back to the mapSee this site on the map/All of Georgia
Thor Equities
Kingston Area Data Center (Thor Equities)
Bartow County, Georgia
Proposed · first reported Sep 8, 2026
~35mifrom the boundary ofChattahoochee River National Recreation Area · location held to about a kilometer, so the distance is approximate
- FootprintIn the pipeline, size not disclosedProposed or under construction with no published figure and no scale signal. In the queue to be read.
The source
Bisnow AtlantaSource on file. The name, operator and capacity haven’t yet been read back against the source.
What’s happened here
Nothing dated on this site yet beyond its listing. A hearing, a filing, a vote, a photograph from the road: if you know of one, it belongs here.
Add to the record
What you post goes on this page the moment its source checks, labeled as a reader’s report. We don’t edit it and we don’t take sides on it.