← All actions
Record closed August 6, 2026
Protective action worth supporting

Support Broward County coral reef renewal off Florida

Broward County EPD-Artificial Reef/ coral nursery

U.S. Army Corps of Engineers· Atlantic Ocean federal waters off Broward County, Florida, Artificial reef sites A1, A2, B, C1, C2, C3, E1, and E2Army Corps public notice ↗

Army CorpsWe track this on the agency’s own system of record, where most on-the-ground decisions live.

The groups on this fight

4 groups work Florida

By footprint, from the same match the STAND matchmaker runs; none is linked to this decision in our record yet. Give straight to them; nothing routes through us.

Every group above is on STAND for Public Lands, with its court record, its filings and who backs it.

Eight established reef sites off Florida need a 10-year permit renewal to keep building marine habitat and restoring coral.

What’s at risk

Coral nursery work and marine habitat creation at eight reef sites off Broward County could halt without this renewal. The permit covering concrete modules and decommissioned vessels in federal waters expires and must be reauthorized to continue.

If we stay silent

Broward County and Nova Southeastern University can continue placing reef materials through the next decade, sustaining fish habitat and coral restoration in southeast Florida federal waters.

Our plain-English read of the official notice ↗. Check it against the agency’s own words below.

3 holes in the agency’s own analysis

What the public could have raised, from the agency’s own document

  • I support this action and urge the agency to advance it.
  • I support renewing the Army Corps of Engineers permit that allows Broward County and Nova Southeastern University to continue placing artificial reef materials at sites A1, A2, B, C1, C2, C3, E1, and E2 in federal waters off Florida.
  • Renewing this 10-year authorization lets the project continue building marine habitat in federal Atlantic waters at depths ranging from 6 to 40 feet, using materials from small concrete modules to large decommissioned vessel-reefs.
  • This permit supports active coral nursery work alongside habitat creation, making the reef program a restoration effort that benefits marine ecosystems rather than harming them.
  • Say something only you can say. The law requires the agency to consider and respond to substantive comments, and specifics are what make a comment substantive.

In the agency’s own words

The applicant is requesting authorization for an additional 10 years for the continued deposition of suitable artificial reef material at the eight (8) previously authorized artificial reef sites identified as A1, A2, B, C1, C2, C3, E1 and E2. The depth of clearance ranges from 6 to 40 feet. The artificial reefs deployed range in size from small (500 lbs, 6' wide by 4' tall) concrete modules to large (multi-ton, +400' length by 50' wide by 60' tall) steel or ferrous and aluminum alloy metal hulled vessel-reefs.

Army Corps public notice ↗

More actions that need you

Go deeper, free

A wrong fact, a dead link, a form that wouldn’t take your letter: one tap and it comes to the people who build PLAN, with this fight attached.

Know an open comment period we are missing, or spotted a wrong deadline? .