MORE THAN JUST PARKS: AMBLER ROAD VIDEO CLIPS (9 clips) Every clip here was recorded from the live Ambler Road investigation at morethanjustparks.com/ambler-road, at 30 frames a second, wide and tall. Free for editorial and advocacy use with the credit on screen while the clip plays and, online, a link to morethanjustparks.com/ambler-road. The satellite imagery under the maps belongs to Esri and its providers, so its credit stays on screen wherever a map does. No commercial licensing, no resale, no AI training. Every figure in a clip is the page's own, sourced on the page and in the README. Credit line (maps): Maps and animation: More Than Just Parks. Imagery: Esri, Maxar, Earthstar Geographics. Credit line (caribou herd): Animation: More Than Just Parks. Mile by mile clips add: Terrain: Mapzen. Link: https://morethanjustparks.com/ambler-road/ All clips: https://morethanjustparks.com/ambler-road/press/video/ Format: H.264 MP4, 30 fps, no audio. 16:9 is 1920 x 1080, 9:16 is 1080 x 1920. A clean plate has no counter or labels on it, for your own type. Each clip holds its last frame for a second and a half so you can cut on it. THE ROAD, ON THE MAP The road draws itself in (10 s) The 211-mile route draws west from the Dalton Highway to the Ambler Mining District, with a mile counter. Source: Route: AIDEA Alternative A centerline, BLM EIS GIS record, 211.18 miles. Preserve boundary: National Park Service. Credit: Maps and animation: More Than Just Parks. Imagery: Esri, Maxar, Earthstar Geographics. Live: https://morethanjustparks.com/ambler-road/road.html mtjp-ambler-road-draws-in-1920x1080.mp4 16:9 1920 × 1080 mtjp-ambler-road-draws-in-1080x1920.mp4 9:16 1080 × 1920 mtjp-ambler-road-draws-in-clean-1920x1080.mp4 Clean 16:9 1920 × 1080 mtjp-ambler-road-draws-in-clean-1080x1920.mp4 Clean 9:16 1080 × 1920 2,932 water crossings (24 s) The camera follows the road west and every bridge and culvert lands as the road reaches it. The named rivers flash on the way, and it ends on the national preserve. Source: AIDEA Alternative A engineering file, crossing inventory, counted by More Than Just Parks; the Record of Decision's structure table totals the same. Credit: Maps and animation: More Than Just Parks. Imagery: Esri, Maxar, Earthstar Geographics. Live: https://morethanjustparks.com/ambler-road/road.html#s-rivers mtjp-ambler-river-crossings-1920x1080.mp4 16:9 1920 × 1080 mtjp-ambler-river-crossings-1080x1920.mp4 9:16 1080 × 1920 mtjp-ambler-river-crossings-clean-1920x1080.mp4 Clean 16:9 1920 × 1080 mtjp-ambler-river-crossings-clean-1080x1920.mp4 Clean 9:16 1080 × 1920 The atlas, crossings by landowner (10 s) The interactive map with every layer on: right-of-way, gravel sites, access roads, airstrips, camps, claims, streams and land status. The crossings fill in from mile 0 to 211, colored by who owns the land under each one. Source: AIDEA Alt. A GIS, USGS National Hydrography Dataset, ADF&G Anadromous Waters Catalog, Alaska DNR, National Park Service. Credit: Maps and animation: More Than Just Parks. Imagery: Esri, Maxar, Earthstar Geographics. Live: https://morethanjustparks.com/ambler-road/map/ mtjp-ambler-atlas-crossings-1920x1080.mp4 16:9 1920 × 1080 mtjp-ambler-atlas-crossings-1080x1920.mp4 9:16 1080 × 1920 Mile by mile, the whole road (42 s) A terrain flight down the centerline from mile 0 to mile 211. A tape on the left counts crossings, bridges, landowner and gravel sites as it goes. Source: Route, crossings, landowner: AIDEA Alt. A, BLM EIS GIS record. Gravel sites: AIDEA's engineering file. Preserve: NPS. Credit: Maps and animation: More Than Just Parks. Imagery: Esri, Maxar, Earthstar Geographics. Terrain: Mapzen. Live: https://morethanjustparks.com/ambler-road/mile-by-mile/ mtjp-ambler-mile-by-mile-full-route-1920x1080.mp4 16:9 1920 × 1080 mtjp-ambler-mile-by-mile-full-route-1080x1920.mp4 9:16 1080 × 1920 mtjp-ambler-mile-by-mile-full-route-clean-1920x1080.mp4 Clean 16:9 1920 × 1080 mtjp-ambler-mile-by-mile-full-route-clean-1080x1920.mp4 Clean 9:16 1080 × 1920 Mile by mile, through the preserve (20 s) The same flight from mile 96 to mile 144, the stretch through Gates of the Arctic National Preserve. Source: Route, crossings, landowner: AIDEA Alt. A, BLM EIS GIS record. Preserve: NPS. Credit: Maps and animation: More Than Just Parks. Imagery: Esri, Maxar, Earthstar Geographics. Terrain: Mapzen. Live: https://morethanjustparks.com/ambler-road/mile-by-mile/#m96 mtjp-ambler-mile-by-mile-through-the-preserve-1920x1080.mp4 16:9 1920 × 1080 mtjp-ambler-mile-by-mile-through-the-preserve-1080x1920.mp4 9:16 1080 × 1920 MORE FROM THE STORY A road is not a line (16 s) Down close to the 250-foot corridor, then out as the rest of the build appears: 137 access-road segments, the gravel mines, airstrips, camps, maintenance stations and towers, to 4,524 acres in all. Source: AIDEA engineering GIS, BLM EIS record. 2024 Record of Decision, p. 12, component table. Credit: Maps and animation: More Than Just Parks. Imagery: Esri, Maxar, Earthstar Geographics. Live: https://morethanjustparks.com/ambler-road/road.html#s-build mtjp-ambler-the-footprint-1920x1080.mp4 16:9 1920 × 1080 mtjp-ambler-the-footprint-1080x1920.mp4 9:16 1080 × 1920 The claims along the corridor (12 s) Active state mining claims appear in the order they were staked, from 2 to 5,122, ending on the deposits the road exists to reach. Source: Alaska DNR state mining claims, date located, counted by More Than Just Parks. Credit: Maps and animation: More Than Just Parks. Imagery: Esri, Maxar, Earthstar Geographics. Live: https://morethanjustparks.com/ambler-road/road.html#s-claims mtjp-ambler-mining-claims-1920x1080.mp4 16:9 1920 × 1080 mtjp-ambler-mining-claims-1080x1920.mp4 9:16 1080 × 1920 Into the national preserve (10 s) Gates of the Arctic, then down into the stretch where the road crosses the preserve: 26 to 27 miles inside the preserve. Source: Park boundary: National Park Service. 2024 Record of Decision, pp. 9 and 12. Credit: Maps and animation: More Than Just Parks. Imagery: Esri, Maxar, Earthstar Geographics. Live: https://morethanjustparks.com/ambler-road/road.html#s-park mtjp-ambler-into-the-preserve-1920x1080.mp4 16:9 1920 × 1080 mtjp-ambler-into-the-preserve-1080x1920.mp4 9:16 1080 × 1920 The Western Arctic Caribou Herd (12 s) One dot for a thousand caribou: more than 490,000 at the 2003 peak, 152,000 in 2023, 121,000 in 2025. Source: 2020 Final EIS, Vol. 1, p. 155 (Dau 2015). Western Arctic Caribou Herd Working Group, December 2025 meeting record, pp. 2 and 5. Credit: Animation: More Than Just Parks. Live: https://morethanjustparks.com/ambler-road/road.html#s-caribou mtjp-ambler-caribou-herd-1920x1080.mp4 16:9 1920 × 1080 mtjp-ambler-caribou-herd-1080x1920.mp4 9:16 1080 × 1920